Splicing Type 241 Mining Cables: AS/NZS 1747 Repair Standards Explained

Technical Guide for Underground Coal Mining Cable Repair & Maintenance

241型矿用电缆接续:AS/NZS 1747维修标准详解 — 安徽飞纯特种电缆有限公司技术指南

Reeling & Trailing Cables for Cranes & Mining — Feichun Special Cable Blogs
Splicing Type 241 Mining Cables: AS/NZS 1747 Repair Standards Explained | Anhui Feichun Special Cable Co., Ltd.
Anhui Feichun Special Cable Co., Ltd. 安徽飞纯特种电缆有限公司

Splicing Type 241 Mining Cables: AS/NZS 1747 Repair Standards Explained

241型矿用电缆拼接:AS/NZS 1747修复标准详解
📅 Updated: February 2026
📋 Standards: AS/NZS 1747:2022, AS/NZS 1802:2018
⚡ Voltage Range: 1.1/1.1kV – 11/11kV

Introduction to Type 241 Mining Cables

Type 241 mining cables represent a specialized category of flexible power cables designed specifically for underground coal mining operations and general mining applications. These cables are manufactured to comply with AS/NZS 1802:2018 standards and are engineered to withstand the demanding environmental conditions found in mining operations. 241型矿用电缆是专为地下煤矿作业和一般采矿应用设计的特殊柔性电力电缆类别。

Type 241 cables feature a construction that includes three semiconductive screened power cores, three separate earth conductors, and one extensible pilot core positioned in the cradle center. The use of semiconductive screens on each power core, rather than a composite screen, significantly improves the cable’s overall flexibility while maintaining electrical integrity. These cables are typically employed for powering continuous miners, supplying pumps, and providing general-purpose power distribution in underground mining environments where flexibility and durability are paramount. 241型电缆具有三个半导体屏蔽电力芯线、三个独立接地导体和一个位于电缆中心的可延伸导引芯线。

Key Applications 主要应用

Continuous Miners: Main feeder cable for power transmission to continuous mining machinery operating in confined underground coal seams. 连续采煤机供电电缆

Pump Cables: Reliable power supply to dewatering pumps and other fluid management systems in underground mining operations. 水泵供电电缆

Monorail Systems: Power distribution for underground transportation systems and material handling equipment. 单轨系统供电

General Mining Equipment: Versatile power supply for various mining machinery and electrical installations. 一般采矿设备供电

Technical Specifications and Construction

The construction of Type 241 cables follows precise engineering standards to ensure reliable performance in harsh mining environments. According to industry specifications, these cables are built with multiple protective layers that work together to provide mechanical strength, electrical insulation, and environmental resistance. 241型电缆的结构遵循精确的工程标准,以确保在恶劣的采矿环境中可靠运行。

Component 部件Material/Specification 材料/规格Purpose 用途
Conductor 导体Flexible stranded tinned annealed copper (AS/NZS 1125-2.10)Current transmission with corrosion resistance
Conductor Screen 导体屏蔽1.1kV: Polyester barrier tape
≥3.3kV: Extruded semiconductive tape
Electric field control and stress distribution
Insulation 绝缘层EPR (Ethylene Propylene Rubber) Type R-EP-90Electrical insulation, flexibility, heat resistance
Insulation Screen 绝缘屏蔽Semiconductive tapeUniform electric field distribution
Cradle Separator 芯线隔离层Semiconductive PCP (Polychloroprene)Core separation and mechanical support
Overall Core Screen 整体芯线屏蔽Semiconductive PCP filling and coveringProtective earth contact before power conductor contact
Earth Conductors 接地导体3× Interstitial semiconductive PCP insulated tinned copperGrounding and fault protection
Pilot Core 导引芯线1× Central extensible EPR covered tinned copperMonitoring and mechanical reinforcement
Outer Sheath 外护套Heavy Duty PCP (HD-PCP) or HD-85-PCP thermosetting compoundMechanical protection, oil/water resistance, UV protection

Reference: AS/NZS 1802:2018 Electric cables – Reeling and trailing – For underground coal mining purposes

Voltage Ratings and Test Requirements 电压等级和测试要求

Rated Voltage 额定电压Test Voltage 测试电压Typical Applications 典型应用
1.1/1.1 kV4.2 kVLow voltage mining equipment, pumps
3.3/3.3 kV12 kVMedium voltage continuous miners, longwall systems
6.6/6.6 kV22 kVHigh power mining machinery
11/11 kV30 kVMain feeder systems, high capacity equipment

AS/NZS 1747:2022 Repair Standards Overview

The AS/NZS 1747:2022 standard establishes comprehensive requirements for the repair, testing, and fitting of accessories to reeling, trailing, and feeder cables used in mining operations. This standard applies to cables used in underground coal mines, metalliferous mines, open cut mines, tunneling operations, quarries, and dredges. The standard was first published in 1975 and has undergone multiple revisions, with the most recent update in 2022 reflecting current industry best practices and technological advancements. AS/NZS 1747:2022标准为采矿作业中使用的卷筒电缆、拖曳电缆和馈电电缆的修复、测试和配件安装制定了全面的要求。

According to the standard, all cable repairs must be performed by qualified cable repairers in designated cable repair facilities that meet specific environmental and equipment requirements. The standard emphasizes that repairs must restore the cable to a condition that ensures safe operation and compliance with the original cable specifications. This includes maintaining proper insulation resistance, mechanical integrity, and electrical performance characteristics. 根据标准,所有电缆修复必须由合格的电缆修复人员在符合特定环境和设备要求的指定电缆修复设施中进行。

Important Safety Requirement: 重要安全要求 Before commencing any repair work, cables must be completely de-energized and properly tagged out according to mine safety protocols. Cable repairers must verify the absence of voltage using appropriate testing equipment and follow all relevant mine safety procedures.

Cable Splicing Procedures for Type 241 Cables

Splicing Type 241 mining cables requires meticulous attention to detail and strict adherence to AS/NZS 1747:2022 procedures. The splicing process restores electrical continuity and mechanical strength to damaged cables while maintaining the original cable’s protective characteristics. According to industry best practices documented by Resources Safety & Health Queensland, proper splicing is critical for preventing cable failures that could result in electrical hazards, production downtime, or personnel safety risks. 241型矿用电缆的拼接需要极其细致的关注和严格遵守AS/NZS 1747:2022程序。

Pre-Splice Preparation 拼接前准备

Before beginning the splicing operation, the cable repairer must verify that the cable is completely de-energized and that appropriate safety protocols are in place. The work area should be clean, well-lit, and maintained at appropriate temperature and humidity levels to ensure proper adhesion of insulating materials. All necessary tools, materials, and splice kits must be verified for compatibility with Type 241 cable specifications and voltage ratings. 在开始拼接操作之前,电缆修复人员必须验证电缆完全断电,并确保适当的安全协议到位。

Required Tools and Materials 所需工具和材料

Cutting Tools: Sharp cable knife, conductor cutters, insulation stripping tools calibrated for EPR insulation

Connection Hardware: Compression connectors sized appropriately for conductor cross-section, hydraulic crimping tool with proper dies

Insulating Materials: High-voltage insulating tape (e.g., 3M Scotch 130C linerless rubber splicing tape), semiconductive tape, PCP jacket repair materials

Testing Equipment: Digital multimeter, insulation resistance tester (megohmmeter) capable of test voltages per AS/NZS 1747:2022

Measuring Tools: Precision measuring tape, diameter gauge, thickness gauge for quality verification

Step-by-Step Splicing Process 分步拼接过程

Step 1: Cable Preparation and Cutting 步骤1:电缆准备和切割

Using a sharp cable knife, make clean perpendicular cuts on both cable ends to be spliced, ensuring the cut faces are square and free from damage. Position the cable ends so that the color rotation of the conductors matches, facilitating proper phase alignment. Circle cut the cable jacket at a distance of approximately 300-350mm from each cable end, taking care not to damage the underlying conductor screens or insulation. From this circle cut, create a smooth taper extending back toward the cable end over a length of approximately 350-400mm. This taper angle should be gradual to prevent stress concentration points in the finished splice. 使用锋利的电缆刀,在要拼接的两个电缆端部进行清洁的垂直切割,确保切割面平整且无损伤。

Step 2: Conductor and Insulation Preparation 步骤2:导体和绝缘准备

Remove the outer jacket and expose the power conductors, earth conductors, and pilot core according to the splice kit specifications, typically 300-350mm from the cable end. Carefully strip the EPR insulation from each power conductor to the length required for the compression connectors being used, typically 40-60mm depending on connector size. The insulation must be removed cleanly without damaging the tinned copper strands. Clean the exposed conductor thoroughly using a suitable solvent to remove any contamination, oxidation, or residue that could affect the quality of the crimped connection. 移除外护套并根据拼接套件规格露出电力导体、接地导体和导引芯线。

Step 3: Conductor Connection 步骤3:导体连接

Before connecting the power conductors, reposition the spliced assembly so that the conductors return to their natural helical lay pattern within the cable structure. This is critical for maintaining mechanical flexibility and preventing stress concentration during cable flexing. Install compression connectors on each power conductor using a hydraulic crimping tool with the appropriate dies specified by the connector manufacturer. The crimping force and die selection must comply with the connector manufacturer’s specifications to ensure a gas-tight, mechanically secure connection with minimal electrical resistance. Stagger the conductor connections along the length of the splice to avoid having all connections at the same cross-sectional plane, which could create a weak point or diameter increase that interferes with cable flexibility. 在连接电力导体之前,重新定位拼接组件,使导体恢复到电缆结构内的自然螺旋排列模式。

Step 4: Earth and Pilot Conductor Connection 步骤4:接地和导引导体连接

Position the earth conductors in their natural location in the valleys between power conductors. Stagger the earth conductor connections to maintain cable flexibility and avoid creating localized stiff sections. Connect each earth conductor using appropriately sized compression connectors, ensuring proper crimping force and connection integrity. For the pilot conductor, trim to the appropriate length and remove insulation from each end corresponding to half the connector length. Connect using the specified compression connector, then insulate the connection using half-lapped layers of high-voltage insulating tape, extending the insulation at least 25mm beyond the connector on each side. Clean the pilot insulation surface before applying tape to ensure proper adhesion. 将接地导体定位在电力导体之间的凹槽中的自然位置。

Step 5: Power Conductor Insulation Restoration 步骤5:电力导体绝缘修复

After all conductor connections are complete and properly positioned, begin restoring the insulation on each power conductor. Clean the existing EPR insulation surface extending at least 50mm beyond each end of the connector. Apply half-lapped layers of premium linerless rubber splicing tape (such as 3M Scotch 130C) starting from the cleaned insulation, across the entire connector, and extending onto the cleaned insulation on the opposite side. Build up the tape layers until the insulation thickness equals or slightly exceeds the original cable insulation thickness. For voltages of 3.3kV and above, apply semiconductive tape over the power conductor insulation to recreate the insulation screen, ensuring continuity with the existing insulation screens. 在所有导体连接完成并正确定位后,开始恢复每个电力导体的绝缘。

Step 6: Overall Assembly and Jacket Restoration 步骤6:整体组装和护套修复

Bundle the entire cable assembly, ensuring all conductors are positioned in their correct locations within the cable cross-section. Bind the assembly using vinyl electrical tape to temporarily hold components in position. Apply a half-lapped layer of cushion tape over the vinyl tape to provide a smooth underlayer. Starting halfway up the jacket tapers, wrap half-lapped layers of heavy-duty jacket repair tape (such as 3M Scotch 130C followed by Scotch 31) building up across the splice until the thickness equals or exceeds the original jacket thickness. Extend the jacket repair tape at least 25mm past the top of each jacket taper. Apply a final protective layer of PCP jacket repair compound or tape to provide mechanical protection, oil resistance, and UV protection equivalent to the original cable jacket. 捆绑整个电缆组件,确保所有导体都位于电缆横截面内的正确位置。

Quality Control Checkpoint: 质量控制检查点 During each step of the splicing process, perform visual inspections to verify workmanship quality. Check for proper tape application (no gaps, wrinkles, or contamination), correct conductor positioning, and appropriate build-up of insulation and jacket materials. Any defects must be corrected before proceeding to the next step.

Testing Requirements per AS/NZS 1747:2022

After completing the splice, comprehensive electrical testing must be performed to verify that the repair meets AS/NZS 1747:2022 requirements. Testing is mandatory before the cable can be returned to service and must be documented in the cable’s permanent maintenance record. According to industry testing protocols, the following tests must be performed in sequence. 完成拼接后,必须进行全面的电气测试,以验证修复符合AS/NZS 1747:2022要求。

Insulation Resistance Testing 绝缘电阻测试

Insulation resistance testing is performed using a calibrated megohmmeter capable of applying the test voltage specified in AS/NZS 1747:2022. For Type 241 cables, the test voltage varies based on the cable’s rated voltage. The insulation resistance test must be conducted between each power conductor and earth, between power conductors, and between the pilot conductor and earth. The minimum acceptable insulation resistance is 1 megohm (MΩ) at the specified test voltage, measured for a duration of one minute. Any reading below 1 MΩ indicates a defect in the splice that must be identified and corrected before the cable can be approved for service. 绝缘电阻测试使用能够施加AS/NZS 1747:2022中规定的测试电压的校准兆欧表进行。

Cable Rated Voltage 电缆额定电压Test Voltage (DC) 测试电压(直流)Minimum Insulation Resistance 最小绝缘电阻Test Duration 测试时长
1.1/1.1 kV1000 V DC≥1 MΩ60 seconds
3.3/3.3 kV2500 V DC≥1 MΩ60 seconds
6.6/6.6 kV5000 V DC≥1 MΩ60 seconds
11/11 kV10000 V DC≥1 MΩ60 seconds

Continuity Testing 连续性测试

Conductor continuity testing verifies that all electrical connections have been properly made and that there are no open circuits in the power conductors, earth conductors, or pilot conductor. Using a low-resistance ohmmeter or multimeter, measure the resistance across each spliced conductor connection. The resistance reading should be negligible (typically less than 0.1 ohms for properly crimped connections) and should not differ significantly from the resistance of an equivalent length of unspliced conductor. Any elevated resistance reading indicates a poor crimp connection that must be remade. 导体连续性测试验证所有电气连接都已正确完成,电力导体、接地导体或导引导体中没有开路。

High-Voltage Withstand Testing 高压耐压测试

For medium and high voltage cables (3.3kV and above), a high-voltage AC withstand test may be required depending on mine safety management plans and regulatory requirements. This test applies a voltage higher than the rated voltage to verify the integrity of the insulation system under stress conditions. The test voltage and duration are specified in AS/NZS 1747:2022 and must be applied using calibrated high-voltage test equipment in a controlled environment. Any breakdown or excessive leakage current during this test indicates an insulation defect requiring repair rework. 对于中压和高压电缆(3.3kV及以上),根据矿山安全管理计划和监管要求,可能需要进行高压交流耐压测试。

Visual and Mechanical Inspection 目视和机械检查

In addition to electrical testing, a thorough visual and mechanical inspection must be performed. Inspect the completed splice for any visible defects including exposed conductors, gaps in insulation or jacket materials, improper tape application, contamination, or mechanical damage. Gently flex the cable at the splice location to verify that the splice maintains flexibility and does not create a rigid section that could lead to stress concentration and eventual failure. The splice diameter should not exceed the original cable diameter by more than 10% to ensure it can pass through cable handling equipment and confined spaces. 除电气测试外,还必须进行彻底的目视和机械检查。

Testing Documentation Requirements 测试文档要求

All test results must be recorded in the cable’s permanent maintenance history record, including test date, cable identification, splice location, test voltages applied, insulation resistance values, conductor resistance measurements, name of cable repairer, and test equipment calibration status. This documentation must be retained for the life of the cable and must be available for inspection by mine safety officials.

Common Splicing Defects and Prevention

Understanding common splicing defects and their prevention is essential for ensuring long-term cable reliability and safety. According to safety bulletins from Resources Safety & Health Queensland, poor repair standards represent a significant cause of cable failures in mining operations. 了解常见的拼接缺陷及其预防对于确保电缆的长期可靠性和安全性至关重要。

Defect Type 缺陷类型Cause 原因Prevention Method 预防方法
Inadequate insulation resistanceContamination during splicing, moisture ingress, insufficient insulation buildupMaintain clean work environment, ensure proper tape application, verify insulation thickness
High connection resistanceImproper crimping force, wrong connector size, oxidized conductorsUse calibrated crimping tools, verify connector sizing, clean conductors thoroughly
Mechanical weakness at spliceExcessive stiffness, inadequate jacket restoration, improper conductor positioningStagger connections, maintain cable lay, ensure adequate jacket buildup
Water ingress into spliceIncomplete jacket sealing, gaps in tape layers, poor taper preparationProper taper angles, half-lapped tape application, seal jacket ends completely
Premature splice failureStress concentration points, incompatible materials, inadequate testingFollow manufacturer specifications, verify material compatibility, comprehensive testing

Critical Safety Note: 关键安全提示 Cable splices that fail electrical testing must never be returned to service. Any splice showing insulation resistance below 1 MΩ, elevated connection resistance, or mechanical defects must be completely remade or the cable section must be replaced. Attempting to use a defective splice creates serious electrical hazards including shock risk, fire potential, and equipment damage.

Maintenance and In-Service Inspection

Regular maintenance and inspection of Type 241 cables, including spliced sections, is essential for preventing failures and ensuring continued safe operation. AS/NZS 1747:2022 provides guidelines for periodic testing and inspection that should be incorporated into mine safety management plans. 定期维护和检查241型电缆(包括拼接部分)对于防止故障和确保持续安全运行至关重要。

Inspection Frequency 检查频率

Visual inspection by machine operators should be performed daily or before each shift, checking for visible damage, jacket cuts, exposed conductors, or abnormal cable heating. Monthly insulation resistance testing should be conducted for critical circuits or cables operating in severe environments. Quarterly comprehensive testing including insulation resistance, earth continuity, and visual inspection is recommended for most mining applications. Annual testing with complete electrical and mechanical evaluation provides baseline condition assessment and trend analysis for predictive maintenance. Any cable that has undergone repair must be tested immediately after the repair and before being returned to service. 机器操作员应每天或每班次前进行目视检查,检查是否有可见损坏、护套割伤、裸露导体或异常电缆发热。

Retirement Criteria 报废标准

Cables should be withdrawn from service when insulation resistance falls below 1 MΩ and cannot be restored through cleaning or drying, when the cable has undergone multiple repairs in the same section indicating chronic failure, when the jacket shows extensive deterioration with multiple punctures or cuts, when conductor corrosion is evident despite the tinned copper construction, or when the cable fails to meet flexibility requirements due to age-hardening of the EPR insulation. The decision to retire a cable should consider the total cost of ownership, including frequent repair costs, downtime, and safety risks. 当绝缘电阻低于1 MΩ且无法通过清洁或干燥恢复时,电缆应停止使用。

Authoritative References and Standards 权威参考资料和标准

AS/NZS 1747:2022 – Reeling, trailing and feeder cables used for mining – Repair, testing and fitting of accessories
Standards New Zealand
https://www.standards.govt.nz/shop/asnzs-17472022
AS/NZS 1802:2018 – Electric cables – Reeling and trailing – For underground coal mining purposes
Standards Australia/Standards New Zealand
https://www.standards.govt.nz/shop/asnzs-18022018
AS/NZS 1747:2003 – Reeling, trailing and feeder cables used for mining – Repair, testing and fitting of accessories
SAI Global
https://infostore.saiglobal.com/en-us/Standards/AS-NZS-1747-2003-117491_SAIG_AS_AS_245945/
Handling and Management of Surface Trailing Cables (Safety Bulletin Update)
Resources Safety & Health Queensland
https://www.rshq.qld.gov.au/safety-notices/mines/handling-and-management-of-surface-trailing-cables-update-to-safety-bulletin-6
Recognised Standard 01: Electrical Installations and Equipment for Coal Mines
Resources Safety & Health Queensland
https://www.resources.qld.gov.au/__data/assets/pdf_file/0019/240382/recognised-standard-01.pdf
Type 241 Cable Technical Specifications
Eland Cables – Mining Cables Portfolio
https://www.elandcables.com/cables/type-240-type-241-and-type-245-flexible-rubber-mining-cables
Comprehensive Technical Guide to AS/NZS 1802 and AS/NZS 2802 Mining Cable Standards
Feichun Special Cable Technical Blogs
https://feichuncables.com/blog/what-are-the-differences-between-various-cable-types-in-the-as-standard/
How to Splice Type G-GC Mining Cables and Tools Required
WesBell Electronics Wire and Cable Technical Resources
https://wesbellwireandcable.com/blog/how-to-splice-type-g-gc-mining-cables-and-tools-required/
AS/NZS 2290.1 – Electrical equipment for coal mines – Introduction, inspection and maintenance
Engineering360 Standards Database
https://standards.globalspec.com/std/1662728/snz-as-nzs-2290-1

Contact Anhui Feichun Special Cable Co., Ltd. 联系安徽飞纯特种电缆有限公司

Technical Support
Sales Contact
Engineering Support

© 2026 Anhui Feichun Special Cable Co., Ltd. 安徽飞纯特种电缆有限公司 | All rights reserved

This technical document is provided for informational purposes. Always consult current AS/NZS standards and qualified professionals for cable installation and repair work.

Previous Article

How to Properly Strain-Relieve Vertical Suspension Cables ((N)SHTÖU) Using Kellem Grips

Next Article

Why Your Reeling Cable Keeps "Corkscrewing":Diagnosis & Solutions for Type 440

Write a Comment

Leave a Comment