{"id":8462,"date":"2026-03-05T17:11:04","date_gmt":"2026-03-05T09:11:04","guid":{"rendered":"https:\/\/feichuncables.com\/blog\/?p=8462"},"modified":"2026-03-05T17:12:27","modified_gmt":"2026-03-05T09:12:27","slug":"sandvik-underground-loaders-sourcing-3-3-3-3kv-european-trailing-cables-for-australian-coal-mines","status":"publish","type":"post","link":"https:\/\/feichuncables.com\/blog\/sandvik-underground-loaders-sourcing-3-3-3-3kv-european-trailing-cables-for-australian-coal-mines\/","title":{"rendered":"Sandvik Underground Loaders: Sourcing 3.3\/3.3kV European Trailing Cables for Australian Coal Mines"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Complete Technical Guide to Sourcing 3.3\/3.3kV European Trailing Cables for Sandvik LHD (Load-Haul-Dump) Underground Loaders in Australian Coal Mines. AS\/NZS 1802 Type 241 Equivalence, IT Earthing System Compatibility, Central Pilot Core Monitoring Requirements, Mechanical Stress for Continuous Reeling, Anti-Torsion Reinforcement, Flame Retardancy Specifications.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u4e3a\u6fb3\u6d32\u7164\u77ffSandvik LHD(\u88c5\u8fd0\u5378\u7535\u94f2)\u4e95\u4e0b\u94f2\u8fd0\u673a\u91c7\u8d2d3.3\/3.3kV\u6b27\u6d32\u62d6\u66f3\u7535\u7f06\u7684\u5b8c\u6574\u6280\u672f\u6307\u5357\u3002AS\/NZS 1802 Type 241\u7b49\u6548\u6027\u3001IT\u63a5\u5730\u7cfb\u7edf\u517c\u5bb9\u6027\u3001\u4e2d\u5fc3\u5148\u5bfc\u82af\u76d1\u6d4b\u9700\u6c42\u3001\u8fde\u7eed\u5377\u7b52\u673a\u68b0\u5e94\u529b\u3001\u9632\u626d\u8f6c\u52a0\u5f3a\u3001\u963b\u71c3\u7b49\u7ea7\u89c4\u8303\u3002<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img data-dominant-color=\"4d4a49\" data-has-transparency=\"false\" style=\"--dominant-color: #4d4a49;\" loading=\"lazy\" decoding=\"async\" width=\"1124\" height=\"595\" sizes=\"auto, (max-width: 1124px) 100vw, 1124px\" src=\"https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-956.avif\" alt=\"\" class=\"wp-image-8464 not-transparent\" title=\"\" srcset=\"https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-956.avif 1124w, https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-956-300x159.avif 300w, https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-956-768x407.avif 768w, https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-956-400x212.avif 400w, https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-956-800x423.avif 800w, https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-956-832x440.avif 832w\" \/><\/figure>\n\n\n\n<!DOCTYPE html>\n<html lang=\"en\">\n<head>\n<meta charset=\"UTF-8\">\n<meta name=\"viewport\" content=\"width=device-width, initial-scale=1.0\">\n<title>Sandvik Underground Loaders: Sourcing 3.3\/3.3kV European Trailing Cables for Australian Coal Mines | Feichun Cable<\/title>\n<meta name=\"description\" content=\"Complete technical guide: Sourcing 3.3\/3.3kV European trailing cables for Sandvik LHD underground loaders in Australian coal mines. AS\/NZS 1802 Type 241 equivalence, IT earthing system compatibility, pilot core monitoring requirements, mechanical stress for continuous reeling, anti-torsion reinforcement, flame retardancy specifications.\">\n<meta name=\"keywords\" content=\"Sandvik underground loader cable, 3.3\/3.3kV trailing cable, AS\/NZS 1802 Type 241, Australian coal mine cable, Sandvik LH514E cable, Sandvik LH621E trailing cable, LHD trailing cable, mining reeling cable, 3.3kV mining cable, European trailing cable Australia, underground mining cable, heavy duty flexible cable, Type 241 mining cable, NTSCGEW\u00d6U 3.3\/3.3kV, EPR insulated mining cable, PCP sheath trailing cable, flexible copper mining cable, AS\/NZS 1125 conductor, AS\/NZS 3808 insulation, underground coal loader, electric LHD cable, Sandvik Toro cable, mine shuttle car cable, dragline cable, extra heavy duty trailing cable, flame retardant mining cable, IT earthing system cable, symmetrical earth mining cable, central pilot core cable, interstitial earth cable, flexible mining trailing cable, reeling and trailing cable, mine power supply cable, underground excavator cable, continuous miner cable, cable for Sandvik electric loader, VDE 0250 mining cable alternative, Australian standard mining cable, customized NTSCGEW\u00d6U cable, 3.3kV reeling cable, mine haulage cable, flexible elastomer cable, robust mining cable, high tensile strength cable, underground equipment cable, mining machinery cable, Australian mine approval cable, coal mine safety cable, industrial flexible cable, 3x50+3x25\/3+1x16 cable\">\n<meta name=\"author\" content=\"Anhui Feichun Special Cable Co., Ltd.\">\n<link rel=\"canonical\" href=\"https:\/\/feichuncables.com\/blog\/sandvik-lhd-3-3kv\/\">\n<link rel=\"preconnect\" href=\"https:\/\/fonts.googleapis.com\">\n<link rel=\"preconnect\" href=\"https:\/\/fonts.gstatic.com\" crossorigin>\n<link href=\"https:\/\/fonts.googleapis.com\/css2?family=Source+Serif+4:ital,wght@0,400;0,600;0,700;0,800;1,400&#038;family=Instrument+Sans:wght@400;500;600;700&#038;family=IBM+Plex+Mono:wght@400;500&#038;display=swap\" rel=\"stylesheet\">\n<style>:root{color-scheme:light dark;--bg-body:#F5F3EE;--bg-surface:#FFFFFF;--bg-recessed:#EDEAE4;--bg-code:#F0EDE7;--bg-th:#1C1C1C;--bg-tr-alt:#F8F6F2;--bg-callout-blue:#EBF3FD;--bg-callout-amber:#FFF8E6;--bg-callout-green:#E9F7EF;--c-body:#222222;--c-secondary:#4D4D4D;--c-tertiary:#777777;--c-inverse:#FFFFFF;--c-cn:#666666;--c-link:#9B5A12;--c-link-hover:#734210;--c-accent:#B8860B;--b-rule:#D8D5CE;--b-light:#E8E5DF;--b-accent:#B8860B;--b-table:#CBC8C1;--sh-sm:0 1px 2px rgba(0,0,0,0.05);--sh-md:0 3px 10px rgba(0,0,0,0.07);--sh-table:0 1px 4px rgba(0,0,0,0.06);--badge-bg:#1C1C1C;--badge-c:#FFFFFF;--hl-green:#E1F5E6;--hl-red:#FDE8E1;}@media(prefers-color-scheme:dark){:root{--bg-body:#111111;--bg-surface:#1A1A1A;--bg-recessed:#222222;--bg-code:#252525;--bg-th:#282828;--bg-tr-alt:#161616;--bg-callout-blue:#162030;--bg-callout-amber:#25200E;--bg-callout-green:#142218;--c-body:#E2E0DB;--c-secondary:#ADABA6;--c-tertiary:#888683;--c-inverse:#111111;--c-cn:#908E89;--c-link:#D9A63E;--c-link-hover:#EDC462;--c-accent:#D9A63E;--b-rule:#333333;--b-light:#2A2A2A;--b-accent:#D9A63E;--b-table:#363636;--sh-sm:0 1px 2px rgba(0,0,0,0.25);--sh-md:0 3px 10px rgba(0,0,0,0.35);--sh-table:0 1px 4px rgba(0,0,0,0.3);--badge-bg:#D9A63E;--badge-c:#111111;--hl-green:#16291A;--hl-red:#2A1714;}}*,*::before,*::after{box-sizing:border-box;margin:0;padding:0}html{font-size:16px;scroll-behavior:smooth}body{font-family:'Instrument Sans',-apple-system,BlinkMacSystemFont,sans-serif;background:var(--bg-body);color:var(--c-body);line-height:1.8}.page-wrap{max-width:880px;margin:0 auto;padding:2.5rem 1.25rem 4rem}.hdr{padding-bottom:2rem;margin-bottom:2.5rem;border-bottom:2px solid var(--b-accent)}.hdr .badge{display:inline-block;background:var(--badge-bg);color:var(--badge-c);font-size:.68rem;font-weight:700;letter-spacing:.12em;text-transform:uppercase;padding:.3em 1em;border-radius:2px;margin-bottom:1rem}.hdr h1{font-family:'Source Serif 4',Georgia,serif;font-weight:800;font-size:clamp(1.55rem,3.8vw,2.25rem);line-height:1.22;color:var(--c-body);margin-bottom:.65rem}.hdr .sub{font-size:1rem;color:var(--c-secondary);line-height:1.6;margin-bottom:.4rem}.hdr .sub-cn{font-size:.85rem;color:var(--c-cn);line-height:1.6;font-style:italic}.meta{display:flex;flex-wrap:wrap;gap:1rem;margin-top:1.1rem;font-size:.78rem;color:var(--c-tertiary)}.toc{background:var(--bg-surface);border:1px solid var(--b-rule);border-radius:4px;padding:1.2rem 1.4rem;margin-bottom:2.8rem;box-shadow:var(--sh-sm)}.toc-label{font-weight:700;font-size:.72rem;letter-spacing:.1em;text-transform:uppercase;color:var(--c-tertiary);margin-bottom:.55rem}.toc ol{list-style:none;counter-reset:tc;padding:0}.toc li{counter-increment:tc;margin-bottom:.25rem}.toc li::before{content:counter(tc) \".\";font-weight:600;font-family:'IBM Plex Mono',monospace;font-size:.78rem;margin-right:.45em;color:var(--c-tertiary)}.toc a{font-size:.86rem;color:var(--c-secondary);text-decoration:none}.toc a:hover{color:var(--c-link);text-decoration:underline}.body h2{font-family:'Instrument Sans',sans-serif;font-weight:700;font-size:1.32rem;color:var(--c-body);margin:2.8rem 0 .9rem;padding-bottom:.35rem;border-bottom:1px solid var(--b-light)}.body h3{font-weight:600;font-size:1.05rem;color:var(--c-body);margin:1.7rem 0 .55rem}.body p{margin-bottom:1.15rem;color:var(--c-secondary)}.body .cn{font-size:.84rem;color:var(--c-cn);margin-top:-.55rem;margin-bottom:1.15rem;padding-left:1rem;border-left:2px solid var(--b-light);font-style:italic}.body a{color:var(--c-link);text-decoration:underline;text-underline-offset:2px}.body a:hover{color:var(--c-link-hover)}.body strong{font-weight:600;color:var(--c-body)}.p{font-family:'IBM Plex Mono','Consolas',monospace;font-size:.86em;background:var(--bg-code);padding:.12em .4em;border-radius:3px;color:var(--c-body);white-space:nowrap}.eq{display:block;text-align:center;font-family:'IBM Plex Mono',monospace;font-size:.95rem;padding:1rem;margin:1.2rem 0;background:var(--bg-recessed);border-radius:4px;color:var(--c-body)}.tw{width:100%;overflow-x:auto;margin:1.4rem 0 2rem;border:1px solid var(--b-table);border-radius:4px;box-shadow:var(--sh-table)}.tw table{width:100%;border-collapse:collapse;font-size:.86rem;line-height:1.5}.tw caption{text-align:left;font-weight:600;font-size:.78rem;letter-spacing:.04em;text-transform:uppercase;color:var(--c-tertiary);padding:.75rem 1rem .35rem;background:var(--bg-surface);border-bottom:1px solid var(--b-light)}.tw thead th{background:var(--bg-th);color:var(--c-inverse);font-weight:600;font-size:.76rem;letter-spacing:.03em;text-transform:uppercase;padding:.65rem 1rem;text-align:left;white-space:nowrap;border-bottom:2px solid var(--b-accent)}.tw tbody td{padding:.55rem 1rem;border-bottom:1px solid var(--b-light);color:var(--c-secondary);vertical-align:top}.tw tbody tr:nth-child(even){background:var(--bg-tr-alt)}.tw tbody tr:hover{background:var(--bg-callout-amber)}.tw tbody td:first-child{font-weight:500;color:var(--c-body);white-space:nowrap}.tw .g{background:var(--hl-green)}.tw .r{background:var(--hl-red)}.note{padding:1rem 1.2rem;margin:1.5rem 0;border-radius:0 4px 4px 0;font-size:.9rem;border-left:3px solid var(--b-accent)}.note.blue{background:var(--bg-callout-blue)}.note.amber{background:var(--bg-callout-amber)}.note.green{background:var(--bg-callout-green)}.note .nt{font-weight:700;font-size:.78rem;letter-spacing:.06em;text-transform:uppercase;color:var(--c-body);margin-bottom:.3rem}.note p{margin-bottom:.35rem}.refs{margin-top:2.8rem;padding-top:1.5rem;border-top:2px solid var(--b-rule)}.refs h2{font-size:1.08rem;margin-bottom:.9rem}.rl{list-style:none;counter-reset:rf;padding:0}.rl li{counter-increment:rf;font-size:.8rem;color:var(--c-tertiary);margin-bottom:.55rem;padding-left:2.2rem;position:relative;line-height:1.5}.rl li::before{content:\"[\" counter(rf) \"]\";position:absolute;left:0;font-weight:600;color:var(--c-secondary);font-family:'IBM Plex Mono',monospace;font-size:.75rem}.rl a{color:var(--c-link);word-break:break-all}.contact{background:var(--bg-recessed);border:1px solid var(--b-rule);border-radius:4px;padding:1.5rem;margin-top:2.5rem}.contact h3{font-size:.98rem;margin-bottom:.7rem;color:var(--c-body)}.cg{display:grid;grid-template-columns:repeat(auto-fit,minmax(210px,1fr));gap:.75rem}.ci{font-size:.83rem;color:var(--c-secondary);line-height:1.45}.ci .lb{font-weight:600;font-size:.7rem;letter-spacing:.06em;text-transform:uppercase;color:var(--c-tertiary);display:block;margin-bottom:.1rem}.ci a{color:var(--c-link);text-decoration:none}.ci a:hover{text-decoration:underline}.ft{margin-top:2rem;padding-top:1.5rem;border-top:1px solid var(--b-light);font-size:.75rem;color:var(--c-tertiary);text-align:center;line-height:1.55}@media(max-width:600px){.page-wrap{padding:1.2rem 1rem 3rem}.hdr h1{font-size:1.35rem}.tw{font-size:.8rem}.cg{grid-template-columns:1fr}}<\/style>\n<\/head>\n\n<body>\n<article class=\"page-wrap\" itemscope itemtype=\"https:\/\/schema.org\/TechArticle\">\n\n  <header class=\"hdr\">\n    <span class=\"badge\">Feichun Special Cable \u2014 Technical Blog<\/span>\n    <h1 itemprop=\"headline\">Sandvik Underground Loaders: Sourcing 3.3\/3.3kV European Trailing Cables for Australian Coal Mines<\/h1>\n    <p class=\"sub\">Complete Technical Guide to Sourcing 3.3\/3.3kV European Trailing Cables for Sandvik LHD (Load-Haul-Dump) Underground Loaders in Australian Coal Mines. AS\/NZS 1802 Type 241 Equivalence, IT Earthing System Compatibility, Central Pilot Core Monitoring Requirements, Mechanical Stress for Continuous Reeling, Anti-Torsion Reinforcement, Flame Retardancy Specifications.<\/p>\n    <p class=\"sub-cn\">\u4e3a\u6fb3\u6d32\u7164\u77ffSandvik LHD(\u88c5\u8fd0\u5378\u7535\u94f2)\u4e95\u4e0b\u94f2\u8fd0\u673a\u91c7\u8d2d3.3\/3.3kV\u6b27\u6d32\u62d6\u66f3\u7535\u7f06\u7684\u5b8c\u6574\u6280\u672f\u6307\u5357\u3002AS\/NZS 1802 Type 241\u7b49\u6548\u6027\u3001IT\u63a5\u5730\u7cfb\u7edf\u517c\u5bb9\u6027\u3001\u4e2d\u5fc3\u5148\u5bfc\u82af\u76d1\u6d4b\u9700\u6c42\u3001\u8fde\u7eed\u5377\u7b52\u673a\u68b0\u5e94\u529b\u3001\u9632\u626d\u8f6c\u52a0\u5f3a\u3001\u963b\u71c3\u7b49\u7ea7\u89c4\u8303\u3002<\/p>\n    <div class=\"meta\">\n      <span itemprop=\"author\" itemscope itemtype=\"https:\/\/schema.org\/Organization\"><span itemprop=\"name\">Anhui Feichun Special Cable Co., Ltd.<\/span><\/span>\n      <span>|<\/span>\n      <time itemprop=\"datePublished\" datetime=\"2026-03-05\">Mar 05, 2026<\/time>\n      <span>|<\/span>\n      <span>Reading time: ~28 min<\/span>\n    <\/div>\n  <\/header>\n\n  <nav class=\"toc\" aria-label=\"Table of Contents\">\n    <div class=\"toc-label\">Contents<\/div>\n    <ol>\n      <li><a href=\"#s1\">Sandvik LHD Fleet in Australian Coal Mining: Equipment Specifications<\/a><\/li>\n      <li><a href=\"#s2\">3.3\/3.3kV System Design: Why Australian Coal Mines Differ from European Operations<\/a><\/li>\n      <li><a href=\"#s3\">AS\/NZS 1802 Type 241: Mandatory Standard for Underground Loader Cables<\/a><\/li>\n      <li><a href=\"#s4\">Complete Technical Specification: 3&#215;50+3&#215;25\/3+1&#215;16 Cable Structure<\/a><\/li>\n      <li><a href=\"#s5\">IT Earthing System Requirement: Phase-to-Earth Voltage Stress Analysis<\/a><\/li>\n      <li><a href=\"#s6\">Pilot Core (Extensible 16mm\u00b2): Earth Continuity Monitoring Integration<\/a><\/li>\n      <li><a href=\"#s7\">Mechanical Stress: Tensile Load and Anti-Torsion Reinforcement<\/a><\/li>\n      <li><a href=\"#s8\">Bending Radius and Continuous Reeling Performance<\/a><\/li>\n      <li><a href=\"#s9\">Material Systems: EPR Insulation and Extra-Heavy-Duty PCP Sheath<\/a><\/li>\n      <li><a href=\"#s10\">Flame Retardancy and Underground Safety Compliance<\/a><\/li>\n      <li><a href=\"#s11\">European (NTSCGEW\u00d6U) to AS\/NZS Equivalence Assessment<\/a><\/li>\n      <li><a href=\"#s12\">Conclusion: Specification and Procurement Strategy for Sandvik Operations<\/a><\/li>\n    <\/ol>\n  <\/nav>\n\n  <div class=\"body\" itemprop=\"articleBody\">\n\n    <h2 id=\"s1\">1. Sandvik LHD Fleet in Australian Coal Mining: Equipment Specifications<\/h2>\n\n    <p>Sandvik Load-Haul-Dump (LHD) underground loaders represent the workhorse of modern Australian coal mining operations. Models including the LH514E, LH621E, and larger variants operate 24\/7 in underground environments, continuously loading ore or coal into fixed haulage systems. These electrically powered machines (increasingly replacing diesel engines) require reliable power delivery through trailing cables that can withstand continuous reeling, mechanical shock from ore impact, and the harsh underground environment.<\/p>\n\n    <p class=\"cn\">\u5c71\u7279\u7ef4\u514b\u88c5\u8fd0\u5378(LHD)\u4e95\u4e0b\u94f2\u8fd0\u673a\u4ee3\u8868\u73b0\u4ee3\u6fb3\u6d32\u7164\u77ff\u8fd0\u8425\u7684\u4e3b\u529b\u519b\u3002\u5305\u62ecLH514E\u3001LH621E\u548c\u66f4\u5927\u578b\u53f7\u7684\u8f66\u578b\u5728\u5730\u4e0b\u73af\u5883\u4e2d24\/7\u8fd0\u884c\uff0c\u6301\u7eed\u5c06\u77ff\u77f3\u6216\u7164\u70ad\u88c5\u5165\u56fa\u5b9a\u8fd0\u8f93\u7cfb\u7edf\u3002\u8fd9\u4e9b\u7535\u52a8\u673a\u68b0(\u8d8a\u6765\u8d8a\u591a\u5730\u66ff\u4ee3\u67f4\u6cb9\u53d1\u52a8\u673a)\u9700\u8981\u53ef\u9760\u7684\u7535\u529b\u4f20\u8f93\uff0c\u901a\u8fc7\u80fd\u591f\u627f\u53d7\u8fde\u7eed\u5377\u7b52\u3001\u77ff\u77f3\u51b2\u51fb\u673a\u68b0\u51b2\u51fb\u548c\u6076\u52a3\u5730\u4e0b\u73af\u5883\u7684\u62d6\u66f3\u7535\u7f06\u3002<\/p>\n\n    <p><strong>Typical Power Demand:<\/strong> Sandvik LH621E requires approximately 300\u2013350 kW continuous power at 3.3kV, drawing approximately 50\u201360A per phase. The cable must maintain this current delivery across distances of 500\u20131500 meters from the mine substation to the mobile loader position, with voltage drop not exceeding 5% under full load conditions.<\/p>\n\n    <p><strong>Operational Environment:<\/strong> Underground coal mining creates extreme cable stress: (1) continuous mechanical reeling and deployment, (2) temperature variations from cool intake air (8\u201315\u00b0C) to hot mine working areas (25\u201335\u00b0C), (3) moisture from groundwater seepage, (4) rock abrasion as cables are dragged across uneven terrain, (5) potential explosive atmosphere in gaseous mines requiring flame-retardant cable sheathing.<\/p>\n\n    <h2 id=\"s2\">2. 3.3\/3.3kV System Design: Why Australian Coal Mines Differ from European Operations<\/h2>\n\n    <p>The fundamental difference between Australian coal mining electrical systems and European industrial systems is the earthing philosophy. Australian regulations mandate IT earthing (isolated or high-impedance grounded neutral) to enable continued operations during single-phase earth faults, while European systems typically use TN earthing (neutral directly grounded) permitting rapid fault clearance.<\/p>\n\n    <p><strong>IT System Operational Philosophy:<\/strong> When a single-phase earth fault occurs underground, the system does not automatically trip. Instead, the loader can continue operating (at potentially reduced power) while mine personnel locate and repair the fault. This operational continuity is essential because sudden power loss underground creates acute safety hazards\u2014equipment shutdown mid-haul can leave ore suspended in buckets, create entrapment hazards, or disable ventilation systems.<\/p>\n\n    <p><strong>Voltage Stress During Fault:<\/strong> During a phase-to-earth fault in a 3.3kV IT system, the two healthy phases experience sustained voltage rise to approximately 2.87kV phase-to-earth (87% of 3.3kV line voltage). A 3.3\/3.3kV cable, designed for 3.3kV phase-to-earth continuous stress, operates at 87% design stress during fault conditions\u2014providing appropriate 13% safety margin. European 3.6\/6kV cables, rated only for 3.6\/\u221a3 \u2248 2.1kV phase-to-earth, would experience 137% overstress and fail catastrophically within minutes.<\/p>\n\n    <h2 id=\"s3\">3. AS\/NZS 1802 Type 241: Mandatory Standard for Underground Loader Cables<\/h2>\n\n    <p>AS\/NZS 1802 specifies requirements for rubber cables used in underground mining applications. Type 241 designation indicates reeling and trailing cable with symmetrical earth conductor arrangement and central pilot core for earth continuity monitoring.<\/p>\n\n    <p><strong>Type 241 Structure:<\/strong> (1) 3 main power conductors (typically 50\u201395 mm\u00b2 each), (2) 3 interstitial earth conductors in the gaps between power cores (distributed symmetrically), (3) 1 central extensible pilot core (approximately 16 mm\u00b2 capacity) for monitoring earth circuit integrity. This structure provides: electrical balance (symmetrical earth reduces EMI and magnetic field radiation), mechanical stability (interstitial earth conductors provide spacing support), and safety assurance (pilot core enables real-time earth continuity monitoring via dedicated relay).<\/p>\n\n    <p><strong>AS\/NZS Compliance Verification:<\/strong> When procuring European-standard cables as replacements, verification must confirm: (1) conductor configuration matches Type 241 structure exactly, (2) voltage rating is explicitly 3.3\/3.3kV Uo=U, (3) material systems (EPR insulation, PCP sheath) meet Australian durability requirements, (4) testing documentation (type testing, batch testing, environmental durability) is provided with AS\/NZS references.<\/p>\n\n    <h2 id=\"s4\">4. Complete Technical Specification: 3&#215;50+3&#215;25\/3+1&#215;16 Cable Structure<\/h2>\n\n    <div class=\"tw\">\n      <caption>Table 1 \u2014 Sandvik LHD 3.3\/3.3kV Trailing Cable Specification (Type 241 \/ NTSCGEW\u00d6U Equivalent)<\/caption>\n      <table>\n        <thead>\n          <tr>\n            <th>Parameter | \u53c2\u6570<\/th>\n            <th>Value | \u6570\u503c<\/th>\n            <th>Unit | \u5355\u4f4d<\/th>\n            <th>Notes | \u8bf4\u660e<\/th>\n          <\/tr>\n        <\/thead>\n        <tbody>\n          <tr>\n            <td>Conductor Configuration<\/td>\n            <td class=\"g\">3\u00d750 + 3\u00d725\/3 + 1\u00d716<\/td>\n            <td>mm\u00b2<\/td>\n            <td>Power + interstitial earth + pilot core<\/td>\n          <\/tr>\n          <tr>\n            <td>Voltage Rating (Uo\/U)<\/td>\n            <td class=\"g\">3.3 \/ 3.3<\/td>\n            <td>kV<\/td>\n            <td>IT earthing system (Uo=U)<\/td>\n          <\/tr>\n          <tr>\n            <td>Outer Diameter<\/td>\n            <td class=\"g\">42.0 &#8211; 46.0<\/td>\n            <td>mm<\/td>\n            <td>Compact profile for reeling<\/td>\n          <\/tr>\n          <tr>\n            <td>Copper Weight<\/td>\n            <td class=\"g\">~1,875<\/td>\n            <td>kg\/km<\/td>\n            <td>Conductor copper total<\/td>\n          <\/tr>\n          <tr>\n            <td>Total Cable Weight<\/td>\n            <td class=\"g\">~4,200 &#8211; 4,600<\/td>\n            <td>kg\/km<\/td>\n            <td>Incl. insulation &#038; sheath<\/td>\n          <\/tr>\n          <tr>\n            <td>Ampacity (40\u00b0C ambient)<\/td>\n            <td class=\"g\">~155<\/td>\n            <td>A<\/td>\n            <td>Per phase, derating applied<\/td>\n          <\/tr>\n          <tr>\n            <td>Max Tensile Load<\/td>\n            <td class=\"g\">~2,250<\/td>\n            <td>N<\/td>\n            <td>15 N\/mm\u00b2 on 3\u00d750<\/td>\n          <\/tr>\n          <tr>\n            <td>Min Bending Radius (Dynamic)<\/td>\n            <td class=\"g\">~420 &#8211; 460<\/td>\n            <td>mm<\/td>\n            <td>10\u00d7 outer diameter reeling<\/td>\n          <\/tr>\n          <tr>\n            <td>Insulation Material<\/td>\n            <td class=\"g\">EPR Type 3GI3<\/td>\n            <td>\u2014<\/td>\n            <td>Enhanced for mining duty<\/td>\n          <\/tr>\n          <tr>\n            <td>Sheath Material<\/td>\n            <td class=\"g\">PCP 5GM5 (extra-heavy)<\/td>\n            <td>\u2014<\/td>\n            <td>Abrasion &#038; flame resistant<\/td>\n          <\/tr>\n          <tr>\n            <td>Operating Temperature<\/td>\n            <td class=\"g\">-10\u00b0C to +90\u00b0C<\/td>\n            <td>\u2014<\/td>\n            <td>Underground coal mine range<\/td>\n          <\/tr>\n        <\/tbody>\n      <\/table>\n    <\/div>\n\n    <h2 id=\"s5\">5. IT Earthing System Requirement: Phase-to-Earth Voltage Stress Analysis<\/h2>\n\n    <p>The 3.3\/3.3kV specification for Australian coal mines reflects IT earthing system design where the neutral is isolated or grounded through high impedance. This design enables continued loader operation during single-phase earth faults while maintaining safety margins through appropriate cable insulation design.<\/p>\n\n    <p><strong>Voltage Stress Calculation:<\/strong> During a phase-to-ground fault in a 3.3kV IT system with balanced three-phase loading, the two healthy phases experience voltage rise to approximately 0.87 \u00d7 3.3kV \u2248 2.87kV phase-to-earth. A 3.3\/3.3kV cable rated for 3.3kV phase-to-earth design stress experiences 2.87\/3.3 = 87% stress during fault conditions, leaving 13% safety margin for manufacturing tolerances, transient overvoltages, and aging effects.<\/p>\n\n    <p><strong>European Cable Inadequacy:<\/strong> If a mine were to substitute European 3.6\/6kV cables (designed for TN earthing), the phase-to-earth design stress would only be 3.6\/\u221a3 \u2248 2.1kV. During the same 2.87kV fault condition, overstress would be 2.87\/2.1 = 137%\u2014destructive failure within minutes. This is why AS\/NZS 1802 explicitly requires 3.3\/3.3kV rating for Australian underground mining cables.<\/p>\n\n    <h2 id=\"s6\">6. Pilot Core (Extensible 16mm\u00b2): Earth Continuity Monitoring Integration<\/h2>\n\n    <p>The central 16 mm\u00b2 pilot core is essential safety feature specific to Australian mining operations. This core provides dedicated circuit for continuous monitoring of earth circuit integrity, enabling automatic disconnection if cable insulation failure creates ground contact hazard.<\/p>\n\n    <p><strong>ECM System Integration:<\/strong> At the mine substation, an Earth Continuity Monitor (ECM) relay injects low-frequency test signal (approximately 50\u2013100 Hz) into the pilot core. If pilot core remains intact, relay detects signal return and permits loader operation. If pilot core breaks or becomes intermittently open (indicating cable damage), relay opens main power contactor within milliseconds, disconnecting the loader before personnel can be harmed by ground-fault voltage.<\/p>\n\n    <p><strong>Pilot Core Specification:<\/strong> The 16 mm\u00b2 capacity provides adequate current-carrying ability for ECM signal while remaining extensible (flexible enough to flex with the cable during reeling). Without this core, early detection of cable insulation failure is impossible, creating unacceptable personnel safety hazard in mining operations.<\/p>\n\n    <h2 id=\"s7\">7. Mechanical Stress: Tensile Load and Anti-Torsion Reinforcement<\/h2>\n\n    <p>Sandvik LHD operations create extreme mechanical cable stress. The loader must be rapidly deployed (reeled out) to loading position, then retracted (reeled in) after loading. This creates both tensile load (pulling force) and torsional stress (rotational forces) that can exceed safe limits without proper cable design.<\/p>\n\n    <p><strong>Tensile Load Limit:<\/strong> Maximum safe pulling force: F_max = 3 \u00d7 50 \u00d7 15 N\/mm\u00b2 = 2,250 N (approximately 230 kg-force). This limit reflects the aggregate tensile capacity of the three 50 mm\u00b2 power conductors. If loader reeling equipment pulls harder (e.g., to free stuck loader), conductor breakage becomes imminent.<\/p>\n\n    <p><strong>Anti-Torsion Reinforcement:<\/strong> Many Sandvik-specification cables include polyamide or Kevlar anti-torsion braiding between the insulation and outer sheath. This reinforcement prevents cable from twisting (rotating) during reeling, which would otherwise cause &#8220;bird-caging&#8221;\u2014separation of insulation from conductor creating internal shorts. Premium cables specify this reinforcement as mandatory; procurement must explicitly verify inclusion in the cable specification.<\/p>\n\n    <h2 id=\"s8\">8. Bending Radius and Continuous Reeling Performance<\/h2>\n\n    <p>Continuous reeling imposes strict bending radius requirements. Cables bent too sharply experience insulation compression and conductor fatigue that cause accelerated failure.<\/p>\n\n    <p><strong>Specification Requirements:<\/strong> Minimum bending radius for dynamic reeling is typically 10\u00d7 outer diameter. For a cable with 44 mm outer diameter, minimum bending radius is 440 mm. The loader reeling equipment must be designed with pulleys and guide rollers of minimum 440 mm radius to respect this limit. Exceeding the bending radius (bending to 5\u00d7 diameter or less) causes insulation cracking within weeks of operation.<\/p>\n\n    <p><strong>Reeling Cycle Endurance:<\/strong> Sandvik loaders typically undergo 20,000\u201350,000 reeling cycles annually (50\u2013150 cycles daily over 300+ operating days). Enhanced EPR insulation and extra-heavy-duty PCP sheath are specifically formulated to withstand this volume of flexing without insulation degradation, maintaining service life of 5\u20137 years.<\/p>\n\n    <h2 id=\"s9\">9. Material Systems: EPR Insulation and Extra-Heavy-Duty PCP Sheath<\/h2>\n\n    <p>The material systems distinguish Australian coal-mine-rated cables from baseline European industrial standards.<\/p>\n\n    <p><strong>EPR Type 3GI3 Insulation:<\/strong> Enhanced ethylene propylene rubber with: (1) superior cross-linking for sustained 3.3kV voltage stress, (2) thermal stabilizers for temperature cycling (-10\u00b0C to +90\u00b0C in coal mines), (3) ozone scavenging compounds for any above-ground cable sections exposed to sunlight, (4) antioxidants for moisture-laden underground environments, (5) dielectric strength 18\u201320 kV\/mm. This formulation adds approximately 20% cost premium over baseline EPR but is essential for mining-grade reliability.<\/p>\n\n    <p><strong>Extra-Heavy-Duty PCP Sheath (5GM5):<\/strong> Polychloroprene (neoprene) formulation with exceptional properties: (1) abrasion resistance\u2014coal mines drag cables across rough rock surfaces; the sheath must withstand this contact without tearing, (2) flame retardancy per IEC 60332-1\u2014essential for gaseous mines where ignition hazard exists, (3) tear propagation resistance\u2014a small puncture must not propagate into large tear, (4) oil resistance\u2014for occasional contact with hydraulic equipment leaks, (5) sheath thickness 2.8\u20133.2 mm (versus 2.0\u20132.2 mm for standard industrial), providing mechanical protection and redundancy if minor damage occurs.<\/p>\n\n    <h2 id=\"s10\">10. Flame Retardancy and Underground Safety Compliance<\/h2>\n\n    <p>Australian coal mining regulations impose strict flame retardancy requirements. In gaseous mines (coal mining operations historically), an electrical spark or high-temperature cable surface could ignite methane-air mixtures, creating catastrophic explosion.<\/p>\n\n    <p><strong>IEC 60332-1-2 Compliance:<\/strong> Underground cable sheathing must pass this standard test: (1) a burning source (small flame) is applied to cable surface, (2) flame must not propagate beyond specified distance (typically <600 mm), (3) burning material must not drip and ignite materials below the cable, (4) smoldering or continued burning is not permitted after flame source is removed. The extra-heavy-duty PCP sheath with flame-retardant additive package achieves V-0 classification per UL94\u2014the highest flame resistance rating.<\/p>\n\n    <p><strong>Mine Safety Documentation:<\/strong> All underground cables must be certified for mining use per WorkSafe Victoria, NSW Resources Regulator, or Queensland Department of Resources. Certification documents must be provided with the cable to verify compliance. European cables without Australian certification are not acceptable for underground deployment.<\/p>\n\n    <h2 id=\"s11\">11. European (NTSCGEW\u00d6U) to AS\/NZS Equivalence Assessment<\/h2>\n\n    <p>The cable designation NTSCGEW\u00d6U (or variations) indicates European VDE 0250-813 standard trailing cable. However, for Australian coal mining deployment, the cable must be verified to meet AS\/NZS 1802 Type 241 equivalence.<\/p>\n\n    <p><strong>Equivalence Requirements:<\/strong> (1) Voltage rating explicitly stated as 3.3\/3.3kV Uo=U, not European 3.6\/6kV or other ratings, (2) conductor configuration matches 3\u00d750+3\u00d725\/3+1\u00d716 structure, (3) insulation and sheath materials documented as EPR Type 3GI3 and PCP 5GM5 respectively, (4) mechanical properties confirmed (tensile strength, bending radius), (5) flame retardancy testing per IEC 60332-1-2 with documentation, (6) environmental durability testing (UV aging, thermal cycling) confirming performance under Australian coal mining conditions.<\/p>\n\n    <p><strong>Documentation Requirements:<\/strong> Before finalizing purchase, obtain: (1) technical specification sheet with all above parameters, (2) type testing report (initial certification to applicable standards), (3) batch testing report (routine quality verification), (4) environmental durability test data, (5) compliance declaration signed by manufacturer.<\/p>\n\n    <h2 id=\"s12\">12. Conclusion: Specification and Procurement Strategy for Sandvik Operations<\/h2>\n\n    <p>Sourcing 3.3\/3.3kV trailing cables for Sandvik LHD loaders in Australian coal mines requires precise specification matching to AS\/NZS 1802 Type 241 requirements. The fundamental design difference between Australian (IT earthing, 3.3\/3.3kV Uo=U) and European (TN earthing, typically 3.6\/6kV or other ratings) systems mandates careful cable selection to ensure safe operation during the earth fault conditions that frequently occur in underground mining.<\/p>\n\n    <p>Key specification elements include: (1) explicit 3.3\/3.3kV voltage rating for IT earthing system compliance, (2) Type 241 structure with central pilot core for earth continuity monitoring, (3) enhanced EPR insulation and extra-heavy-duty PCP sheath for mining durability, (4) anti-torsion reinforcement for reeling stress tolerance, (5) flame retardancy certification per IEC 60332-1-2, (6) comprehensive testing documentation confirming AS\/NZS compliance.<\/p>\n\n    <p>Feichun Special Cable manufactures 3.3\/3.3kV trailing cables engineered to AS\/NZS 1802 Type 241 specifications for Australian coal mining operations. Our technical team provides equipment assessment, specification verification, testing documentation, and supply chain coordination for Sandvik LHD installations and other underground mining applications throughout Australian coal industry.<\/p>\n\n  <\/div>\n\n  <section class=\"refs\">\n    <h2>References &#038; Sources<\/h2>\n    <ol class=\"rl\">\n      <li>AS\/NZS 1802:2012, &#8220;Rubber cables for underground mining applications,&#8221; Standards New Zealand and Standards Australia.<\/li>\n      <li>VDE 0250-813:2016, &#8220;Flexible cables \u2013 Part 813: Flexible cables for use with mining equipment,&#8221; Verband der Elektrotechnik Elektronik Informationstechnik.<\/li>\n      <li>IEC 60332-1-2:2019, &#8220;Test methods for flame propagation \u2013 Part 1-2,&#8221; International Electrotechnical Commission.<\/li>\n      <li>WorkSafe Victoria, &#8220;Underground Mining Electrical Safety Standards,&#8221; Mining Safety Guidelines, 2023.<\/li>\n      <li>Feichun Special Cable Research &#038; Development Team, &#8220;3.3\/3.3kV Type 241 Trailing Cables for Sandvik LHD Operations: Australian Coal Mining Specifications,&#8221; Technical Report, 2024.<\/li>\n    <\/ol>\n  <\/section>\n\n  <div class=\"contact\">\n    <h3>Contact Anhui Feichun Special Cable Co., Ltd.<\/h3>\n    <div class=\"cg\">\n      <div class=\"ci\">\n        <span class=\"lb\">3.3\/3.3kV Type 241 Sandvik LHD Cables<\/span>\n        <a href=\"\/cdn-cgi\/l\/email-protection#92e6f7f1fad2f4f7fbf1fae7fcf1f3f0fef7e1bcf1fdff\" rel=\"nofollow\"><span class=\"__cf_email__\" data-cfemail=\"9eeafbfdf6def8fbf7fdf6ebf0fdfffcf2fbedb0fdf1f3\">[email&#160;protected]<\/span><\/a>\n      <\/div>\n      <div class=\"ci\">\n        <span class=\"lb\">Australian Coal Mining &#038; Equipment Support<\/span>\n        <a href=\"\/cdn-cgi\/l\/email-protection#e78a8e898e8980a781828e848f92898486858b8294c984888a\" rel=\"nofollow\"><span class=\"__cf_email__\" data-cfemail=\"7815111611161f381e1d111b100d161b191a141d0b561b1715\">[email&#160;protected]<\/span><\/a>\n      <\/div>\n      <div class=\"ci\">\n        <span class=\"lb\">Sales &#038; Mining Procurement<\/span>\n        <a href=\"\/cdn-cgi\/l\/email-protection#2251434e47516244474b414a574c4143404e47510c414d4f\" rel=\"nofollow\"><span class=\"__cf_email__\" data-cfemail=\"493a28252c3a092f2c202a213c272a282b252c3a672a2624\">[email&#160;protected]<\/span><\/a>\n      <\/div>\n      <div class=\"ci\">\n        <span class=\"lb\">WhatsApp \/ WeChat<\/span>\n        <a href=\"https:\/\/wa.me\/8613855123218\" rel=\"nofollow noopener\" target=\"_blank\">+86 138-5512-3218<\/a>\n      <\/div>\n    <\/div>\n  <\/div>\n\n  <footer class=\"ft\">\n    <p>&copy; 2026 Anhui Feichun Special Cable Co., Ltd. \u2014 All rights reserved.<\/p>\n    <p>Building A, Private Science &#038; Technology Park, Hefei Economic and Technological Development Zone, Anhui Province, China.<\/p>\n    <p><strong>SEO Keywords:<\/strong> Sandvik underground loader cable, 3.3\/3.3kV trailing cable, AS\/NZS 1802 Type 241, Australian coal mine cable, Sandvik LH514E cable, Sandvik LH621E trailing cable, LHD trailing cable, mining reeling cable, 3.3kV mining cable, European trailing cable Australia, underground mining cable, heavy duty flexible cable, Type 241 mining cable, NTSCGEW\u00d6U 3.3\/3.3kV, EPR insulated mining cable, PCP sheath trailing cable, flexible copper mining cable, AS\/NZS 1125 conductor, AS\/NZS 3808 insulation, underground coal loader, electric LHD cable, Sandvik Toro cable, mine shuttle car cable, dragline cable, extra heavy duty trailing cable, flame retardant mining cable, IT earthing system cable, symmetrical earth mining cable, central pilot core cable, interstitial earth cable, flexible mining trailing cable, reeling and trailing cable, mine power supply cable, underground excavator cable, continuous miner cable, cable for Sandvik electri\n","protected":false},"excerpt":{"rendered":"Sandvik Load-Haul-Dump (LHD) underground loaders represent the workhorse of modern Australian coal mining operations. Models including the LH514E, LH621E, and larger variants operate 24\/7 in underground environments, continuously loading ore or coal into fixed haulage systems. These electrically powered machines (increasingly replacing diesel engines) require reliable power delivery through trailing cables that can withstand continuous reeling, mechanical shock from ore impact, and the harsh underground environment.\n\u5c71\u7279\u7ef4\u514b\u88c5\u8fd0\u5378(LHD)\u4e95\u4e0b\u94f2\u8fd0\u673a\u4ee3\u8868\u73b0\u4ee3\u6fb3\u6d32\u7164\u77ff\u8fd0\u8425\u7684\u4e3b\u529b\u519b\u3002\u5305\u62ecLH514E\u3001LH621E\u548c\u66f4\u5927\u578b\u53f7\u7684\u8f66\u578b\u5728\u5730\u4e0b\u73af\u5883\u4e2d24\/7\u8fd0\u884c\uff0c\u6301\u7eed\u5c06\u77ff\u77f3\u6216\u7164\u70ad\u88c5\u5165\u56fa\u5b9a\u8fd0\u8f93\u7cfb\u7edf\u3002\u8fd9\u4e9b\u7535\u52a8\u673a\u68b0(\u8d8a\u6765\u8d8a\u591a\u5730\u66ff\u4ee3\u67f4\u6cb9\u53d1\u52a8\u673a)\u9700\u8981\u53ef\u9760\u7684\u7535\u529b\u4f20\u8f93\uff0c\u901a\u8fc7\u80fd\u591f\u627f\u53d7\u8fde\u7eed\u5377\u7b52\u3001\u77ff\u77f3\u51b2\u51fb\u673a\u68b0\u51b2\u51fb\u548c\u6076\u52a3\u5730\u4e0b\u73af\u5883\u7684\u62d6\u66f3\u7535\u7f06\u3002","protected":false},"author":1,"featured_media":8464,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"csco_singular_sidebar":"left","csco_page_header_type":"title","csco_page_load_nextpost":"","footnotes":""},"categories":[222,66],"tags":[34714,3322,34310,46078,1831,36925,4155,36912,46072,11579,46071,45570,46069,1114,46070,1079,38357,3320,46064,45968,3726,46065,46075,6630,807,2678,6198,4271,45729,7130,40363,4861,46077,1914,5325,46066,46068,36822,44192,44437,46063,46073,46062,45700,3999,46067,4619,46074,1091,46076],"class_list":["post-8462","post","type-post","status-publish","format-standard","has-post-thumbnail","category-as-nzs-1802-reeling-cables-for-underground-mining","category-common-problems-encountered-in-cable-applications","tag-3-3-3-3kv-trailing-cable","tag-3-3kv-mining-cable","tag-3-3kv-reeling-cable","tag-3x503x25-31x16-cable","tag-as-nzs-1125-conductor","tag-as-nzs-1802-type-241","tag-as-nzs-3808-insulation","tag-australian-coal-mine-cable","tag-australian-mine-approval-cable","tag-australian-standard-mining-cable","tag-cable-for-sandvik-electric-loader","tag-central-pilot-core-cable","tag-coal-mine-safety-cable","tag-continuous-miner-cable","tag-customized-ntscgewou-cable","tag-dragline-cable","tag-electric-lhd-cable","tag-epr-insulated-mining-cable","tag-european-trailing-cable-australia","tag-extra-heavy-duty-trailing-cable","tag-flame-retardant-mining-cable-2","tag-flexible-copper-mining-cable","tag-flexible-elastomer-cable","tag-flexible-mining-trailing-cable","tag-heavy-duty-flexible-cable","tag-high-tensile-strength-cable","tag-industrial-flexible-cable","tag-interstitial-earth-cable","tag-it-earthing-system-cable","tag-lhd-trailing-cable","tag-mine-haulage-cable","tag-mine-power-supply-cable","tag-mine-shuttle-car-cable","tag-mining-machinery-cable","tag-mining-reeling-cable","tag-ntscgewou-3-3-3-3kv","tag-pcp-sheath-trailing-cable","tag-reeling-and-trailing-cable","tag-robust-mining-cable","tag-sandvik-lh514e-cable","tag-sandvik-lh621e-trailing-cable","tag-sandvik-toro-cable","tag-sandvik-underground-loader-cable","tag-symmetrical-earth-mining-cable","tag-type-241-mining-cable","tag-underground-coal-loader","tag-underground-equipment-cable","tag-underground-excavator-cable","tag-underground-mining-cable","tag-vde-0250-mining-cable-alternative","cs-entry"],"_links":{"self":[{"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/posts\/8462","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/comments?post=8462"}],"version-history":[{"count":3,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/posts\/8462\/revisions"}],"predecessor-version":[{"id":8467,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/posts\/8462\/revisions\/8467"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/media\/8464"}],"wp:attachment":[{"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/media?parent=8462"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/categories?post=8462"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/tags?post=8462"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}