{"id":5077,"date":"2026-01-26T11:41:27","date_gmt":"2026-01-26T03:41:27","guid":{"rendered":"https:\/\/feichuncables.com\/blog\/?p=5077"},"modified":"2026-01-26T11:41:31","modified_gmt":"2026-01-26T03:41:31","slug":"vde-recommendations-for-vertical-shaft-cable-installation-preventing-sheath-creepage-in-ntscgewou-cables","status":"publish","type":"post","link":"https:\/\/feichuncables.com\/blog\/vde-recommendations-for-vertical-shaft-cable-installation-preventing-sheath-creepage-in-ntscgewou-cables\/","title":{"rendered":"VDE Recommendations for Vertical Shaft Cable Installation: Preventing Sheath Creepage in (N)TSCGEW\u00d6U Cables"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">\u5782\u76f4\u7ad6\u4e95\u7535\u7f06\u5b89\u88c5\u4e2d\u7684VDE\u62a4\u5957\u8815\u53d8\u9884\u9632\u5efa\u8bae<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img data-dominant-color=\"887382\" data-has-transparency=\"false\" style=\"--dominant-color: #887382;\" loading=\"lazy\" decoding=\"async\" width=\"1008\" height=\"590\" sizes=\"auto, (max-width: 1008px) 100vw, 1008px\" src=\"https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-601.avif\" alt=\"\" class=\"wp-image-5078 not-transparent\" title=\"\" srcset=\"https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-601.avif 1008w, https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-601-300x176.avif 300w, https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-601-768x450.avif 768w, https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-601-400x234.avif 400w, https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-601-800x468.avif 800w, https:\/\/feichuncables.com\/blog\/wp-content\/uploads\/image-601-832x487.avif 832w\" \/><\/figure>\n\n\n\n<!DOCTYPE html>\n<html lang=\"en\">\n<head>\n    <meta charset=\"UTF-8\">\n    <meta name=\"viewport\" content=\"width=device-width, initial-scale=1.0\">\n    <title>VDE Recommendations for Vertical Cable Installation &#8211; Preventing Sheath Creepage | Anhui Feichun Special Cable<\/title>\n    <meta name=\"description\" content=\"Technical guide on VDE standards for clamping distances in vertical shaft cable installations to prevent sheath creepage, featuring (N)TSCGEW\u00d6U cables and international standards compliance.\">\n    <style>\n        * {\n            margin: 0;\n            padding: 0;\n            box-sizing: border-box;\n        }\n        \n        body {\n            font-family: -apple-system, BlinkMacSystemFont, \"Segoe UI\", Roboto, \"Helvetica Neue\", Arial, sans-serif;\n            line-height: 1.8;\n            max-width: 100%;\n            margin: 0;\n            padding: 20px;\n        }\n        \n        .container {\n            max-width: 1200px;\n            margin: 0 auto;\n        }\n        \n        header {\n            padding: 30px 0;\n            margin-bottom: 40px;\n            border-bottom: 2px solid;\n        }\n        \n        h1 {\n            font-size: 2.2em;\n            margin-bottom: 15px;\n            line-height: 1.3;\n        }\n        \n        .subtitle {\n            font-size: 1.1em;\n            opacity: 0.8;\n            margin-bottom: 10px;\n        }\n        \n        h2 {\n            font-size: 1.8em;\n            margin-top: 50px;\n            margin-bottom: 20px;\n            padding-bottom: 10px;\n            border-bottom: 1px solid;\n        }\n        \n        h3 {\n            font-size: 1.4em;\n            margin-top: 35px;\n            margin-bottom: 15px;\n        }\n        \n        p {\n            margin-bottom: 20px;\n            text-align: justify;\n        }\n        \n        table {\n            width: 100%;\n            border-collapse: collapse;\n            margin: 30px 0;\n            font-size: 0.95em;\n            box-shadow: 0 2px 8px rgba(0,0,0,0.15);\n        }\n        \n        thead {\n            font-weight: bold;\n            text-transform: uppercase;\n            letter-spacing: 0.5px;\n        }\n        \n        th, td {\n            padding: 15px;\n            text-align: left;\n            border: 1px solid;\n        }\n        \n        th {\n            font-size: 0.9em;\n        }\n        \n        tbody tr:nth-child(even) {\n            opacity: 0.95;\n        }\n        \n        .reference {\n            font-size: 0.9em;\n            margin-top: 50px;\n            padding-top: 30px;\n            border-top: 1px solid;\n        }\n        \n        .reference h3 {\n            margin-top: 0;\n        }\n        \n        .reference ol {\n            margin-left: 25px;\n            line-height: 2;\n        }\n        \n        .reference li {\n            margin-bottom: 15px;\n        }\n        \n        .contact-info {\n            margin: 40px 0;\n            padding: 25px;\n            border: 1px solid;\n            border-radius: 8px;\n        }\n        \n        .contact-info p {\n            margin-bottom: 10px;\n        }\n        \n        .note {\n            padding: 20px;\n            margin: 25px 0;\n            border-left: 4px solid;\n            font-size: 0.95em;\n        }\n        \n        footer {\n            margin-top: 60px;\n            padding-top: 30px;\n            border-top: 2px solid;\n            text-align: center;\n            font-size: 0.9em;\n        }\n        \n        a {\n            text-decoration: none;\n            transition: opacity 0.2s;\n        }\n        \n        a:hover {\n            opacity: 0.7;\n        }\n        \n        .technical-spec {\n            display: grid;\n            grid-template-columns: repeat(auto-fit, minmax(250px, 1fr));\n            gap: 20px;\n            margin: 30px 0;\n        }\n        \n        .spec-item {\n            padding: 20px;\n            border: 1px solid;\n            border-radius: 6px;\n        }\n        \n        .spec-item strong {\n            display: block;\n            margin-bottom: 8px;\n            font-size: 1.05em;\n        }\n        \n        @media (max-width: 768px) {\n            body {\n                padding: 15px;\n            }\n            \n            h1 {\n                font-size: 1.8em;\n            }\n            \n            h2 {\n                font-size: 1.5em;\n            }\n            \n            table {\n                font-size: 0.85em;\n            }\n            \n            th, td {\n                padding: 10px;\n            }\n        }\n    <\/style>\n<\/head>\n<body>\n    <div class=\"container\">\n        <header>\n            <h1>VDE Recommendations for Vertical Shaft Cable Installation: Preventing Sheath Creepage in (N)TSCGEW\u00d6U Cables<\/h1>\n            <p class=\"subtitle\">\u5782\u76f4\u7ad6\u4e95\u7535\u7f06\u5b89\u88c5\u4e2d\u7684VDE\u62a4\u5957\u8815\u53d8\u9884\u9632\u5efa\u8bae<\/p>\n            <p class=\"subtitle\"><strong>Anhui Feichun Special Cable Co., Ltd. | \u5b89\u5fbd\u98de\u7eaf\u7279\u79cd\u7535\u7f06\u6709\u9650\u516c\u53f8<\/strong><\/p>\n        <\/header>\n\n        <section>\n            <h2>Introduction \u4ecb\u7ecd<\/h2>\n            <p>When installing power cables in vertical shafts, elevator shafts, or mining applications, proper mechanical support is essential to prevent cable degradation and ensure long-term reliability. Sheath creepage, the phenomenon where cable outer sheaths slide or migrate downward under gravitational stress, represents a critical failure mechanism that can compromise cable integrity and system safety. This technical guide examines the VDE standards and international best practices for clamping distances when installing (N)TSCGEW\u00d6U cables and similar heavy-duty mining cables in vertical configurations.<\/p>\n            \n            <p>\u5728\u5782\u76f4\u7ad6\u4e95\u3001\u7535\u68af\u4e95\u6216\u91c7\u77ff\u5e94\u7528\u4e2d\u5b89\u88c5\u7535\u529b\u7535\u7f06\u65f6\uff0c\u6b63\u786e\u7684\u673a\u68b0\u652f\u6491\u5bf9\u4e8e\u9632\u6b62\u7535\u7f06\u9000\u5316\u548c\u786e\u4fdd\u957f\u671f\u53ef\u9760\u6027\u81f3\u5173\u91cd\u8981\u3002\u62a4\u5957\u8815\u53d8\u662f\u6307\u7535\u7f06\u5916\u62a4\u5957\u5728\u91cd\u529b\u4f5c\u7528\u4e0b\u5411\u4e0b\u6ed1\u52a8\u6216\u8fc1\u79fb\u7684\u73b0\u8c61\uff0c\u8fd9\u662f\u4e00\u79cd\u5173\u952e\u7684\u5931\u6548\u673a\u5236\uff0c\u53ef\u80fd\u4f1a\u635f\u5bb3\u7535\u7f06\u5b8c\u6574\u6027\u548c\u7cfb\u7edf\u5b89\u5168\u3002\u672c\u6280\u672f\u6307\u5357\u63a2\u8ba8\u4e86\u5728\u5782\u76f4\u914d\u7f6e\u4e2d\u5b89\u88c5(N)TSCGEW\u00d6U\u7535\u7f06\u548c\u7c7b\u4f3c\u91cd\u578b\u91c7\u77ff\u7535\u7f06\u65f6\u7684VDE\u6807\u51c6\u548c\u56fd\u9645\u6700\u4f73\u5b9e\u8df5\u7684\u5939\u7d27\u8ddd\u79bb\u3002<\/p>\n        <\/section>\n\n        <section>\n            <h2>Understanding (N)TSCGEW\u00d6U Cables \u4e86\u89e3(N)TSCGEW\u00d6U\u7535\u7f06<\/h2>\n            <p>(N)TSCGEW\u00d6U cables are heavy-duty flexible mining and reeling cables manufactured according to DIN VDE 0250 standards. These cables feature tough rubber sheathing designed for extreme mechanical stress, abrasion resistance, and submersible applications up to 100 meters depth. The designation indicates specific construction characteristics:<\/p>\n            \n            <p>(N)TSCGEW\u00d6U\u7535\u7f06\u662f\u6839\u636eDIN VDE 0250\u6807\u51c6\u5236\u9020\u7684\u91cd\u578b\u67d4\u6027\u91c7\u77ff\u548c\u5377\u7b52\u7535\u7f06\u3002\u8fd9\u4e9b\u7535\u7f06\u5177\u6709\u575a\u97e7\u7684\u6a61\u80f6\u62a4\u5957\uff0c\u4e13\u4e3a\u6781\u7aef\u673a\u68b0\u5e94\u529b\u3001\u8010\u78e8\u635f\u548c100\u7c73\u6df1\u5ea6\u7684\u6f5c\u6c34\u5e94\u7528\u800c\u8bbe\u8ba1\u3002<\/p>\n\n            <div class=\"technical-spec\">\n                <div class=\"spec-item\">\n                    <strong>N = Harmonized (\u6807\u51c6\u5316)<\/strong>\n                    <p>National German standard conformity \u7b26\u5408\u5fb7\u56fd\u56fd\u5bb6\u6807\u51c6<\/p>\n                <\/div>\n                <div class=\"spec-item\">\n                    <strong>T = Dry locations (\u5e72\u71e5\u573a\u6240)<\/strong>\n                    <p>Suitable for dry installation environments \u9002\u7528\u4e8e\u5e72\u71e5\u5b89\u88c5\u73af\u5883<\/p>\n                <\/div>\n                <div class=\"spec-item\">\n                    <strong>S = Heavy duty (\u91cd\u578b)<\/strong>\n                    <p>Reinforced construction for severe mechanical stress \u52a0\u56fa\u7ed3\u6784\u4ee5\u627f\u53d7\u4e25\u91cd\u673a\u68b0\u5e94\u529b<\/p>\n                <\/div>\n                <div class=\"spec-item\">\n                    <strong>C = Screened\/Shielded (\u5c4f\u853d)<\/strong>\n                    <p>Electromagnetic shielding protection \u7535\u78c1\u5c4f\u853d\u4fdd\u62a4<\/p>\n                <\/div>\n                <div class=\"spec-item\">\n                    <strong>GE = Rubber insulation (\u6a61\u80f6\u7edd\u7f18)<\/strong>\n                    <p>Ethylene-propylene rubber compound \u4e59\u4e19\u6a61\u80f6\u5316\u5408\u7269<\/p>\n                <\/div>\n                <div class=\"spec-item\">\n                    <strong>W\u00d6 = Weather and oil resistant (\u8010\u5019\u8010\u6cb9)<\/strong>\n                    <p>Polychloroprene outer sheath \u6c2f\u4e01\u6a61\u80f6\u5916\u62a4\u5957<\/p>\n                <\/div>\n                <div class=\"spec-item\">\n                    <strong>U = Submersible (\u53ef\u6f5c\u6c34)<\/strong>\n                    <p>Water-resistant up to 100m depth \u9632\u6c34\u6df1\u5ea6\u8fbe100\u7c73<\/p>\n                <\/div>\n            <\/div>\n        <\/section>\n\n        <section>\n            <h2>VDE Standards for Vertical Cable Installation VDE\u5782\u76f4\u7535\u7f06\u5b89\u88c5\u6807\u51c6<\/h2>\n            \n            <h3>DIN VDE 0298 Series: Cable Application Guidelines DIN VDE 0298\u7cfb\u5217\uff1a\u7535\u7f06\u5e94\u7528\u6307\u5357<\/h3>\n            <p>The DIN VDE 0298 standard series provides comprehensive guidelines for cable application in power installations. Specifically, DIN VDE 0298-3 addresses the use of non-harmonized cables and includes provisions for mechanical installation requirements including bending radii and support methods. While VDE standards primarily focus on electrical safety parameters such as clearance and creepage distances for insulation coordination, the mechanical support requirements for vertical installations draw from both German national standards and international practices.<\/p>\n            \n            <p>DIN VDE 0298\u6807\u51c6\u7cfb\u5217\u4e3a\u7535\u529b\u88c5\u7f6e\u4e2d\u7684\u7535\u7f06\u5e94\u7528\u63d0\u4f9b\u4e86\u5168\u9762\u7684\u6307\u5357\u3002\u5177\u4f53\u800c\u8a00\uff0cDIN VDE 0298-3\u6d89\u53ca\u975e\u7edf\u4e00\u7535\u7f06\u7684\u4f7f\u7528\uff0c\u5e76\u5305\u62ec\u673a\u68b0\u5b89\u88c5\u8981\u6c42\u7684\u89c4\u5b9a\uff0c\u5305\u62ec\u5f2f\u66f2\u534a\u5f84\u548c\u652f\u6491\u65b9\u6cd5\u3002<\/p>\n\n            <h3>Electrical vs. Mechanical Support Requirements \u7535\u6c14\u4e0e\u673a\u68b0\u652f\u6491\u8981\u6c42<\/h3>\n            <p>It is important to distinguish between two types of spacing requirements in cable standards. VDE standards such as DIN VDE 0110-1 (based on IEC 60664-1) primarily address clearance and creepage distances for electrical insulation coordination. These measurements ensure adequate spacing between conductive parts to prevent electrical breakdown and arcing. According to industry technical documentation, creepage distance represents the shortest path along an insulating surface between conductors, while clearance refers to the direct air gap distance.<\/p>\n            \n            <p>\u91cd\u8981\u7684\u662f\u8981\u533a\u5206\u7535\u7f06\u6807\u51c6\u4e2d\u7684\u4e24\u79cd\u95f4\u8ddd\u8981\u6c42\u3002VDE\u6807\u51c6\u5982DIN VDE 0110-1\uff08\u57fa\u4e8eIEC 60664-1\uff09\u4e3b\u8981\u6d89\u53ca\u7535\u6c14\u7edd\u7f18\u534f\u8c03\u7684\u95f4\u9699\u548c\u722c\u7535\u8ddd\u79bb\u3002\u8fd9\u4e9b\u6d4b\u91cf\u786e\u4fdd\u5bfc\u7535\u90e8\u4ef6\u4e4b\u95f4\u6709\u8db3\u591f\u7684\u95f4\u8ddd\u4ee5\u9632\u6b62\u7535\u51fb\u7a7f\u548c\u7535\u5f27\u3002<\/p>\n\n            <p>However, mechanical support spacing for vertical installations serves a different purpose: preventing cable damage from gravitational stress, sheath slippage, and strain concentration at termination points. These mechanical requirements are governed by installation standards rather than purely electrical safety standards.<\/p>\n        <\/section>\n\n        <section>\n            <h2>International Standards for Vertical Cable Support \u5782\u76f4\u7535\u7f06\u652f\u6491\u7684\u56fd\u9645\u6807\u51c6<\/h2>\n            \n            <h3>NEC 300.19: Supporting Conductors in Vertical Raceways NEC 300.19\uff1a\u5782\u76f4\u7ebf\u69fd\u4e2d\u7684\u5bfc\u4f53\u652f\u6491<\/h3>\n            <p>The National Electrical Code (NEC) Article 300.19, published by the National Fire Protection Association (NFPA 70), provides the most widely recognized technical framework for supporting conductors in vertical installations. According to NEC 300.19(A), conductors in vertical raceways must be supported when the vertical rise exceeds specified values based on conductor size. One cable support must be provided at the top of the vertical raceway or as close to the top as practical, with intermediate supports installed to limit unsupported conductor lengths.<\/p>\n            \n            <p>\u7531\u7f8e\u56fd\u56fd\u5bb6\u6d88\u9632\u534f\u4f1a\uff08NFPA 70\uff09\u53d1\u5e03\u7684\u300a\u56fd\u5bb6\u7535\u6c14\u89c4\u8303\u300b\uff08NEC\uff09\u7b2c300.19\u6761\u4e3a\u5782\u76f4\u5b89\u88c5\u4e2d\u7684\u5bfc\u4f53\u652f\u6491\u63d0\u4f9b\u4e86\u6700\u5e7f\u6cdb\u8ba4\u53ef\u7684\u6280\u672f\u6846\u67b6\u3002<\/p>\n\n            <table>\n                <thead>\n                    <tr>\n                        <th>Conductor Size<br>\u5bfc\u4f53\u5c3a\u5bf8<\/th>\n                        <th>Copper Maximum Unsupported Length<br>\u94dc\u5bfc\u4f53\u6700\u5927\u65e0\u652f\u6491\u957f\u5ea6<\/th>\n                        <th>Aluminum Maximum Unsupported Length<br>\u94dd\u5bfc\u4f53\u6700\u5927\u65e0\u652f\u6491\u957f\u5ea6<\/th>\n                    <\/tr>\n                <\/thead>\n                <tbody>\n                    <tr>\n                        <td>18 AWG to 8 AWG<\/td>\n                        <td>30 m (100 ft)<\/td>\n                        <td>30 m (100 ft)<\/td>\n                    <\/tr>\n                    <tr>\n                        <td>6 AWG to 1\/0 AWG<\/td>\n                        <td>30 m (100 ft)<\/td>\n                        <td>61 m (200 ft)<\/td>\n                    <\/tr>\n                    <tr>\n                        <td>2\/0 AWG to 4\/0 AWG<\/td>\n                        <td>24 m (80 ft)<\/td>\n                        <td>55 m (180 ft)<\/td>\n                    <\/tr>\n                    <tr>\n                        <td>Over 4\/0 AWG to 350 kcmil<\/td>\n                        <td>18 m (60 ft)<\/td>\n                        <td>43 m (140 ft)<\/td>\n                    <\/tr>\n                    <tr>\n                        <td>Over 350 kcmil to 500 kcmil<\/td>\n                        <td>15 m (50 ft)<\/td>\n                        <td>37 m (120 ft)<\/td>\n                    <\/tr>\n                    <tr>\n                        <td>Over 500 kcmil to 750 kcmil<\/td>\n                        <td>12 m (40 ft)<\/td>\n                        <td>30 m (100 ft)<\/td>\n                    <\/tr>\n                    <tr>\n                        <td>Over 750 kcmil<\/td>\n                        <td>11 m (35 ft)<\/td>\n                        <td>27 m (90 ft)<\/td>\n                    <\/tr>\n                <\/tbody>\n            <\/table>\n            \n            <p class=\"note\"><strong>Note \u6ce8\u610f:<\/strong> Data derived from NFPA 70 NEC Table 300.19(A). For steel wire armored cables, special clamping methods must be employed that clamp the armor rather than the insulation. A safety device should be installed at the lower end to prevent slippage in case of support failure.<\/p>\n            \n            <p class=\"note\"><strong>\u6ce8\u610f:<\/strong> \u6570\u636e\u6765\u6e90\u4e8eNFPA 70 NEC\u8868300.19(A)\u3002\u5bf9\u4e8e\u94a2\u4e1d\u94e0\u88c5\u7535\u7f06\uff0c\u5fc5\u987b\u91c7\u7528\u5939\u7d27\u94e0\u88c5\u800c\u975e\u7edd\u7f18\u5c42\u7684\u7279\u6b8a\u5939\u7d27\u65b9\u6cd5\u3002\u5e94\u5728\u4e0b\u7aef\u5b89\u88c5\u5b89\u5168\u88c5\u7f6e\u4ee5\u9632\u6b62\u652f\u6491\u5931\u6548\u65f6\u7684\u6ed1\u79fb\u3002<\/p>\n        <\/section>\n\n        <section>\n            <h2>Practical Recommendations for (N)TSCGEW\u00d6U Cable Installation (N)TSCGEW\u00d6U\u7535\u7f06\u5b89\u88c5\u7684\u5b9e\u7528\u5efa\u8bae<\/h2>\n            \n            <h3>Clamping Distance Recommendations \u5939\u7d27\u8ddd\u79bb\u5efa\u8bae<\/h3>\n            <p>For heavy-duty mining cables such as (N)TSCGEW\u00d6U installed in vertical shafts, conservative support spacing is recommended due to the cable&#8217;s significant weight and flexibility. Based on international standards and manufacturer recommendations, the following guidelines should be observed:<\/p>\n            \n            <p>\u5bf9\u4e8e\u5b89\u88c5\u5728\u5782\u76f4\u7ad6\u4e95\u4e2d\u7684(N)TSCGEW\u00d6U\u7b49\u91cd\u578b\u91c7\u77ff\u7535\u7f06\uff0c\u7531\u4e8e\u7535\u7f06\u91cd\u91cf\u5927\u4e14\u67d4\u97e7\u6027\u9ad8\uff0c\u5efa\u8bae\u91c7\u7528\u4fdd\u5b88\u7684\u652f\u6491\u95f4\u8ddd\u3002<\/p>\n\n            <div class=\"technical-spec\">\n                <div class=\"spec-item\">\n                    <strong>Primary Support Interval \u4e3b\u8981\u652f\u6491\u95f4\u9694<\/strong>\n                    <p>12-15 meters (40-50 feet) maximum spacing for typical medium voltage mining cables in vertical shafts<\/p>\n                    <p>\u5782\u76f4\u7ad6\u4e95\u4e2d\u5178\u578b\u4e2d\u538b\u91c7\u77ff\u7535\u7f06\u7684\u6700\u5927\u95f4\u8ddd\u4e3a12-15\u7c73\uff0840-50\u82f1\u5c3a\uff09<\/p>\n                <\/div>\n                <div class=\"spec-item\">\n                    <strong>Top Support \u9876\u90e8\u652f\u6491<\/strong>\n                    <p>Mandatory support at or near the top of vertical rise, within 1 meter of entry point<\/p>\n                    <p>\u5728\u5782\u76f4\u4e0a\u5347\u7684\u9876\u90e8\u6216\u9644\u8fd1\u5f3a\u5236\u652f\u6491\uff0c\u8ddd\u79bb\u5165\u53e3\u70b91\u7c73\u4ee5\u5185<\/p>\n                <\/div>\n                <div class=\"spec-item\">\n                    <strong>Intermediate Supports \u4e2d\u95f4\u652f\u6491<\/strong>\n                    <p>Additional supports every 12-15 meters to prevent excessive cable weight concentration<\/p>\n                    <p>\u6bcf12-15\u7c73\u589e\u52a0\u989d\u5916\u652f\u6491\u4ee5\u9632\u6b62\u7535\u7f06\u91cd\u91cf\u8fc7\u5ea6\u96c6\u4e2d<\/p>\n                <\/div>\n                <div class=\"spec-item\">\n                    <strong>Safety Margin \u5b89\u5168\u88d5\u5ea6<\/strong>\n                    <p>Reduce spacing by 20% when cable weight exceeds 5 kg\/m or in high-vibration environments<\/p>\n                    <p>\u5f53\u7535\u7f06\u91cd\u91cf\u8d85\u8fc75\u516c\u65a4\/\u7c73\u6216\u5728\u9ad8\u632f\u52a8\u73af\u5883\u4e2d\u65f6\uff0c\u51cf\u5c1120%\u7684\u95f4\u8ddd<\/p>\n                <\/div>\n            <\/div>\n\n            <h3>Support Method Selection \u652f\u6491\u65b9\u6cd5\u9009\u62e9<\/h3>\n            <p>According to NEC 300.19(C), several approved methods exist for supporting cables in vertical installations. For rubber-sheathed mining cables, the following methods are recommended in order of preference:<\/p>\n            \n            <p>\u6839\u636eNEC 300.19(C)\uff0c\u5782\u76f4\u5b89\u88c5\u4e2d\u652f\u6491\u7535\u7f06\u6709\u51e0\u79cd\u8ba4\u53ef\u7684\u65b9\u6cd5\u3002\u5bf9\u4e8e\u6a61\u80f6\u62a4\u5957\u91c7\u77ff\u7535\u7f06\uff0c\u6309\u4f18\u5148\u987a\u5e8f\u63a8\u8350\u4ee5\u4e0b\u65b9\u6cd5\uff1a<\/p>\n\n            <p><strong>Clamping Devices with Insulating Wedges \u5e26\u7edd\u7f18\u6954\u5757\u7684\u5939\u7d27\u88c5\u7f6e:<\/strong> The most common method employs insulating wedge plugs inserted at raceway terminations. These devices distribute clamping pressure uniformly around the cable circumference without damaging the outer sheath. For (N)TSCGEW\u00d6U cables, multiple-segment wedge designs are preferred over single-piece plugs to accommodate the softer insulation compounds used in mining applications.<\/p>\n            \n            <p><strong>\u5177\u6709\u7edd\u7f18\u6954\u5757\u7684\u5939\u7d27\u88c5\u7f6e:<\/strong> \u6700\u5e38\u89c1\u7684\u65b9\u6cd5\u662f\u5728\u7ebf\u69fd\u7ec8\u7aef\u63d2\u5165\u7edd\u7f18\u6954\u5f62\u585e\u3002\u8fd9\u4e9b\u88c5\u7f6e\u5728\u7535\u7f06\u5468\u56f4\u5747\u5300\u5206\u5e03\u5939\u7d27\u538b\u529b\uff0c\u800c\u4e0d\u4f1a\u635f\u574f\u5916\u62a4\u5957\u3002<\/p>\n\n            <p><strong>Junction Box Deflection Method \u63a5\u7ebf\u76d2\u504f\u8f6c\u65b9\u6cd5:<\/strong> Cables can be supported by deflecting them at least ninety degrees within junction boxes and carrying them horizontally for a distance not less than twice the cable diameter. When this method is employed, support spacing must be reduced to twenty percent of the standard intervals specified in Table 300.19(A).<\/p>\n            \n            <p><strong>Steel Wire Armor Specific Supports \u94a2\u4e1d\u94e0\u88c5\u4e13\u7528\u652f\u6491:<\/strong> Although (N)TSCGEW\u00d6U cables do not typically incorporate steel wire armor, similar heavy-duty cables with metallic reinforcement require specialized support clamps that grip the armor layer. These installations must include fail-safe devices at the lower terminus to prevent catastrophic failure if primary supports slip.<\/p>\n        <\/section>\n\n        <section>\n            <h2>Prevention of Sheath Creepage \u62a4\u5957\u8815\u53d8\u7684\u9884\u9632<\/h2>\n            \n            <h3>Understanding Sheath Creepage Mechanisms \u4e86\u89e3\u62a4\u5957\u8815\u53d8\u673a\u5236<\/h3>\n            <p>Sheath creepage in vertical cable installations occurs when the outer protective layer migrates downward relative to the internal conductors due to insufficient mechanical support. This phenomenon is particularly problematic in rubber-sheathed cables where the sheath material exhibits viscoelastic properties under sustained stress. Over time, gravitational forces can cause the sheath to slide, potentially exposing underlying insulation or creating stress concentrations at support points.<\/p>\n            \n            <p>\u5782\u76f4\u7535\u7f06\u5b89\u88c5\u4e2d\u7684\u62a4\u5957\u8815\u53d8\u53d1\u751f\u5728\u5916\u90e8\u4fdd\u62a4\u5c42\u7531\u4e8e\u673a\u68b0\u652f\u6491\u4e0d\u8db3\u800c\u76f8\u5bf9\u4e8e\u5185\u90e8\u5bfc\u4f53\u5411\u4e0b\u8fc1\u79fb\u65f6\u3002\u8fd9\u79cd\u73b0\u8c61\u5728\u6a61\u80f6\u62a4\u5957\u7535\u7f06\u4e2d\u5c24\u5176\u6210\u95ee\u9898\uff0c\u56e0\u4e3a\u62a4\u5957\u6750\u6599\u5728\u6301\u7eed\u5e94\u529b\u4e0b\u8868\u73b0\u51fa\u7c98\u5f39\u6027\u7279\u6027\u3002<\/p>\n\n            <h3>Design Strategies for Creepage Prevention \u8815\u53d8\u9884\u9632\u7684\u8bbe\u8ba1\u7b56\u7565<\/h3>\n            <p>Effective prevention of sheath creepage requires a comprehensive approach addressing both support design and installation methodology. Primary support clamps should distribute clamping force over a sufficient length of cable to prevent point loading that could initiate sheath movement. Industry experience suggests that support clamps engaging at least 150-200mm of cable length provide optimal stress distribution for mining-grade cables.<\/p>\n            \n            <p>\u6709\u6548\u9884\u9632\u62a4\u5957\u8815\u53d8\u9700\u8981\u7efc\u5408\u8003\u8651\u652f\u6491\u8bbe\u8ba1\u548c\u5b89\u88c5\u65b9\u6cd5\u3002\u4e3b\u8981\u652f\u6491\u5939\u5e94\u5728\u8db3\u591f\u957f\u5ea6\u7684\u7535\u7f06\u4e0a\u5206\u914d\u5939\u7d27\u529b\uff0c\u4ee5\u9632\u6b62\u53ef\u80fd\u5f15\u53d1\u62a4\u5957\u79fb\u52a8\u7684\u70b9\u8f7d\u8377\u3002<\/p>\n\n            <p>Temperature cycling in shaft environments can exacerbate creepage tendencies by causing cyclic expansion and contraction of sheath materials. In applications where temperature variations exceed thirty degrees Celsius, consideration should be given to reducing standard support intervals by twenty to thirty percent. The polychloroprene (chloroprene rubber) outer sheath used in (N)TSCGEW\u00d6U cables provides good resistance to creepage compared to standard PVC, but proper mechanical support remains essential.<\/p>\n            \n            <p>\u7ad6\u4e95\u73af\u5883\u4e2d\u7684\u6e29\u5ea6\u5faa\u73af\u53ef\u80fd\u901a\u8fc7\u5f15\u8d77\u62a4\u5957\u6750\u6599\u7684\u5faa\u73af\u81a8\u80c0\u548c\u6536\u7f29\u800c\u52a0\u5267\u8815\u53d8\u503e\u5411\u3002\u5728\u6e29\u5ea6\u53d8\u5316\u8d85\u8fc730\u6444\u6c0f\u5ea6\u7684\u5e94\u7528\u4e2d\uff0c\u5e94\u8003\u8651\u5c06\u6807\u51c6\u652f\u6491\u95f4\u9694\u51cf\u5c1120%\u81f330%\u3002<\/p>\n        <\/section>\n\n        <section>\n            <h2>Installation Best Practices \u5b89\u88c5\u6700\u4f73\u5b9e\u8df5<\/h2>\n            \n            <h3>Pre-Installation Planning \u5b89\u88c5\u524d\u89c4\u5212<\/h3>\n            <p>Successful vertical cable installation begins with thorough planning that accounts for shaft geometry, cable weight, environmental conditions, and access limitations. Cable weight calculations must consider both the linear weight per meter and the cumulative weight at each support point. For (N)TSCGEW\u00d6U cables in common cross-sections, linear weights typically range from three to fifteen kilograms per meter depending on conductor size and number of cores.<\/p>\n            \n            <p>\u6210\u529f\u7684\u5782\u76f4\u7535\u7f06\u5b89\u88c5\u59cb\u4e8e\u5145\u5206\u7684\u89c4\u5212\uff0c\u8003\u8651\u7ad6\u4e95\u51e0\u4f55\u5f62\u72b6\u3001\u7535\u7f06\u91cd\u91cf\u3001\u73af\u5883\u6761\u4ef6\u548c\u901a\u9053\u9650\u5236\u3002\u7535\u7f06\u91cd\u91cf\u8ba1\u7b97\u5fc5\u987b\u8003\u8651\u6bcf\u7c73\u7684\u7ebf\u6027\u91cd\u91cf\u548c\u6bcf\u4e2a\u652f\u6491\u70b9\u7684\u7d2f\u79ef\u91cd\u91cf\u3002<\/p>\n\n            <h3>Pulling and Installation Techniques \u62c9\u52a8\u548c\u5b89\u88c5\u6280\u672f<\/h3>\n            <p>Vertical cable pulling requires specialized techniques to prevent damage during installation. When pulling cables upward in vertical shafts, synchronized cable pushers positioned at multiple levels can reduce tensile stress compared to single-point pulling from the top. Breaking mechanisms must be installed to prevent free-fall in the event of pulling wire failure, as gravitational acceleration can quickly exceed the cable&#8217;s structural capacity. Professional installation companies with experience in hydro power, mining, or high-rise applications should be consulted for complex vertical installations exceeding fifty meters.<\/p>\n            \n            <p>\u5782\u76f4\u7535\u7f06\u62c9\u52a8\u9700\u8981\u4e13\u95e8\u7684\u6280\u672f\u4ee5\u9632\u6b62\u5b89\u88c5\u8fc7\u7a0b\u4e2d\u7684\u635f\u574f\u3002\u5728\u5782\u76f4\u7ad6\u4e95\u4e2d\u5411\u4e0a\u62c9\u7535\u7f06\u65f6\uff0c\u4f4d\u4e8e\u591a\u4e2a\u6c34\u5e73\u7684\u540c\u6b65\u7535\u7f06\u63a8\u8fdb\u5668\u53ef\u4ee5\u51cf\u5c11\u4e0e\u4ece\u9876\u90e8\u5355\u70b9\u62c9\u52a8\u76f8\u6bd4\u7684\u62c9\u4f38\u5e94\u529b\u3002<\/p>\n\n            <h3>Snaking and Fixation \u86c7\u5f62\u5e03\u7f6e\u548c\u56fa\u5b9a<\/h3>\n            <p>Once cables are positioned in vertical shafts, proper snaking (controlled slack routing) prevents excessive strain at support points while accommodating thermal expansion and contraction. The cable route should follow a gentle sinusoidal pattern between support clamps, with the amplitude of each curve proportional to the support spacing. Care must be taken to avoid creating closed loops of ferromagnetic steel in support structures, as these can induce heating through electromagnetic coupling in power cables.<\/p>\n            \n            <p>\u4e00\u65e6\u7535\u7f06\u5b9a\u4f4d\u5728\u5782\u76f4\u7ad6\u4e95\u4e2d\uff0c\u9002\u5f53\u7684\u86c7\u5f62\u5e03\u7f6e\uff08\u53d7\u63a7\u677e\u5f1b\u8def\u7531\uff09\u53ef\u9632\u6b62\u652f\u6491\u70b9\u5904\u7684\u8fc7\u5ea6\u5e94\u53d8\uff0c\u540c\u65f6\u9002\u5e94\u70ed\u81a8\u80c0\u548c\u6536\u7f29\u3002<\/p>\n        <\/section>\n\n        <section>\n            <h2>Compliance and Quality Assurance \u5408\u89c4\u6027\u548c\u8d28\u91cf\u4fdd\u8bc1<\/h2>\n            \n            <p>Installations should be documented with detailed support spacing measurements, clamp torque specifications, and photographic evidence of proper installation. Regular inspection intervals should be established to monitor for signs of sheath migration, support loosening, or environmental degradation. Particular attention should be paid to the top support point and first intermediate support, as these locations experience the highest sustained stress.<\/p>\n            \n            <p>\u5b89\u88c5\u5e94\u8bb0\u5f55\u8be6\u7ec6\u7684\u652f\u6491\u95f4\u8ddd\u6d4b\u91cf\u3001\u5939\u7d27\u626d\u77e9\u89c4\u683c\u548c\u9002\u5f53\u5b89\u88c5\u7684\u7167\u7247\u8bc1\u636e\u3002\u5e94\u5efa\u7acb\u5b9a\u671f\u68c0\u67e5\u95f4\u9694\u4ee5\u76d1\u6d4b\u62a4\u5957\u8fc1\u79fb\u3001\u652f\u6491\u677e\u52a8\u6216\u73af\u5883\u9000\u5316\u7684\u8ff9\u8c61\u3002<\/p>\n\n            <p>Quality cable materials conforming to DIN VDE 0250 specifications provide the foundation for reliable vertical installations. (N)TSCGEW\u00d6U cables manufactured to these standards incorporate sheath compounds specifically formulated to resist creepage under sustained mechanical stress. However, no cable construction can compensate for inadequate mechanical support design.<\/p>\n        <\/section>\n\n        <div class=\"contact-info\">\n            <h3>Contact Anhui Feichun Special Cable Co., Ltd. \u8054\u7cfb\u5b89\u5fbd\u98de\u7eaf\u7279\u79cd\u7535\u7f06\u6709\u9650\u516c\u53f8<\/h3>\n            <p><strong>Company \u516c\u53f8:<\/strong> Anhui Feichun Special Cable Co., Ltd. | \u5b89\u5fbd\u98de\u7eaf\u7279\u79cd\u7535\u7f06\u6709\u9650\u516c\u53f8<\/p>\n            <p><strong>WhatsApp:<\/strong> <a href=\"https:\/\/wa.me\/8613855123218\" rel=\"nofollow noopener\" target=\"_blank\">+86 13855 123218<\/a><\/p>\n            <p><strong>Technical Support \u6280\u672f\u652f\u6301:<\/strong> <a href=\"mailto:tech@feichuncables.com\" rel=\"nofollow\">tech@feichuncables.com<\/a><\/p>\n            <p><strong>Engineering Inquiries \u5de5\u7a0b\u54a8\u8be2:<\/strong> <a href=\"mailto:zihao.yang@feichuncables.com\" rel=\"nofollow\">zihao.yang@feichuncables.com<\/a><\/p>\n            <p><strong>Sales Contact \u9500\u552e\u8054\u7cfb:<\/strong> <a href=\"mailto:ziyu.huang@feichuncables.com\" rel=\"nofollow\">ziyu.huang@feichuncables.com<\/a><\/p>\n        <\/div>\n\n        <section class=\"reference\">\n            <h3>References and Standards \u53c2\u8003\u6587\u732e\u548c\u6807\u51c6<\/h3>\n            <ol>\n                <li>NFPA 70, National Electrical Code (NEC), Article 300.19 &#8211; Supporting Conductors in Vertical Raceways. National Fire Protection Association, 2023 Edition. <a href=\"https:\/\/up.codes\/s\/supporting-conductors-in-vertical-raceways\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/up.codes\/s\/supporting-conductors-in-vertical-raceways<\/a><\/li>\n                \n                <li>DIN VDE 0110-1 (IEC 60664-1) &#8211; Insulation Coordination for Equipment within Low-Voltage Systems &#8211; Part 1: Principles, Requirements and Tests. VDE Verlag GmbH. <a href=\"https:\/\/www.weidmueller.com\/int\/products\/connectivity\/pcb_terminals_and_connectors\/creepage_and_clearance_distances.jsp\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/www.weidmueller.com\/int\/products\/connectivity\/pcb_terminals_and_connectors\/creepage_and_clearance_distances.jsp<\/a><\/li>\n                \n                <li>DIN VDE 0250 &#8211; Cables, Wires and Flexible Cords for Power Installations. German National Standard for Mining and Industrial Cables. <a href=\"https:\/\/www.elandcables.com\/electrical-cable-and-accessories\/cables-by-standard\/vde0250-cable\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/www.elandcables.com\/electrical-cable-and-accessories\/cables-by-standard\/vde0250-cable<\/a><\/li>\n                \n                <li>DIN VDE 0298-3 &#8211; Application of Cables and Cords in Power Installations &#8211; Part 3: Guide to Use of Non-Harmonized Cables. <a href=\"https:\/\/www.dinmedia.de\/en\/standard\/din-vde-0298-3\/88069819\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/www.dinmedia.de\/en\/standard\/din-vde-0298-3\/88069819<\/a><\/li>\n                \n                <li>NEMA VE 2-2018, Cable Tray Installation Guidelines. National Electrical Manufacturers Association. <a href=\"https:\/\/mphusky.com\/wp-content\/uploads\/2024\/01\/NEMA-VE-2-2018.pdf\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/mphusky.com\/wp-content\/uploads\/2024\/01\/NEMA-VE-2-2018.pdf<\/a><\/li>\n                \n                <li>Cableizer Technical Blog, &#8220;Cable Pulling in Vertical Shafts.&#8221; Professional installation guidance for vertical HV cable installations. <a href=\"https:\/\/www.cableizer.com\/blog\/post\/cable-pulling-vertical-shafts\/\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/www.cableizer.com\/blog\/post\/cable-pulling-vertical-shafts\/<\/a><\/li>\n                \n                <li>IEEE Std 575-2014, IEEE Guide for Bonding Shields and Sheaths of Single-Conductor Power Cables Rated 5 kV through 500 kV. Institute of Electrical and Electronics Engineers. <a href=\"https:\/\/ieeexplore.ieee.org\/document\/6748625\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/ieeexplore.ieee.org\/document\/6748625<\/a><\/li>\n                \n                <li>Belden Cable Technical Resources, &#8220;Understanding Creepage and Clearance Distances in Electrical Systems.&#8221; Technical guidance on electrical safety spacing requirements. <a href=\"https:\/\/www.belden.com\" rel=\"nofollow noopener\" target=\"_blank\">https:\/\/www.belden.com<\/a><\/li>\n            <\/ol>\n        <\/section>\n\n        <footer>\n            <p>&copy; 2026 Anhui Feichun Special Cable Co., Ltd. | \u5b89\u5fbd\u98de\u7eaf\u7279\u79cd\u7535\u7f06\u6709\u9650\u516c\u53f8<\/p>\n            <p>All technical specifications subject to verification. Consult qualified electrical engineers for specific installation requirements.<\/p>\n            <p>\u6240\u6709\u6280\u672f\u89c4\u683c\u9700\u7ecf\u9a8c\u8bc1\u3002\u5177\u4f53\u5b89\u88c5\u8981\u6c42\u8bf7\u54a8\u8be2\u5408\u683c\u7684\u7535\u6c14\u5de5\u7a0b\u5e08\u3002<\/p>\n        <\/footer>\n    <\/div>\n<\/body>\n<\/html>\n","protected":false},"excerpt":{"rendered":"VDE vertical cable installation, NTSCGEW\u00d6U cable specifications, DIN VDE 0250 mining cable, sheath creepage prevention, vertical shaft cable support, cable clamping distance standards, NEC 300.19 vertical conductor support, polychloprene rubber cable, heavy duty mining cable, submersible cable installation, vertical cable support spacing, cable support clamp design, mining cable installation guide, flexible reeling cable, DIN VDE 0298 cable application, rubber insulated mining cable, steel wire armored cable support, vertical raceway cable installation, creepage distance electrical safety, IEC 60664-1 clearance standards, cable sheath migration, gravitational cable stress, elevator shaft cable installation, power cable vertical mounting, cable support intervals, mining cable standards, armored cable vertical installation, cable pulling techniques vertical, flexible cable vertical support, industrial cable installation best practices, heavy cable weight distribution, cable thermal expansion vertical, mining cable VDE compliance, vertical cable strain relief, cable installation torque specifications, rubber sheath cable properties, chloroprene cable sheath, EPR insulated cable, vertical cable inspection procedures, cable support safety devices, mining cable manufacturer China, special cable Anhui, custom mining cables, vertical cable engineering, cable installation planning, high voltage vertical cable, medium voltage mining cable, cable mechanical support design, cable snaking vertical installation, anti-creepage cable support","protected":false},"author":1,"featured_media":5078,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"csco_singular_sidebar":"left","csco_page_header_type":"title","csco_page_load_nextpost":"","footnotes":""},"categories":[66,94,56],"tags":[33818,33807,33780,33790,33814,33806,33792,33799,33816,33784,33801,33804,33798,33226,33812,33800,6139,33787,33809,820,33811,832,33791,33793,152,33817,33796,33802,828,3388,4246,1710,33813,33781,31707,33788,33795,12160,33808,33782,33815,33803,33785,33783,33794,33797,33805,33789,33810,33786],"class_list":["post-5077","post","type-post","status-publish","format-standard","has-post-thumbnail","category-common-problems-encountered-in-cable-applications","category-din-vde-0250-mining-cable","category-reeling-cable","tag-anti-creepage-cable-support","tag-armored-cable-vertical-installation","tag-cable-clamping-distance-standards","tag-cable-installation-planning","tag-cable-installation-torque-specifications","tag-cable-mechanical-support-design","tag-cable-pulling-techniques-vertical","tag-cable-sheath-migration","tag-cable-snaking-vertical-installation","tag-cable-support-clamp-design","tag-cable-support-intervals","tag-cable-support-safety-devices","tag-cable-thermal-expansion-vertical","tag-chloroprene-cable-sheath","tag-creepage-distance-electrical-safety","tag-custom-mining-cables","tag-din-vde-0250-mining-cable","tag-din-vde-0298-cable-application","tag-elevator-shaft-cable-installation","tag-epr-insulated-cable","tag-flexible-cable-vertical-support","tag-flexible-reeling-cable","tag-gravitational-cable-stress","tag-heavy-cable-weight-distribution","tag-heavy-duty-mining-cable","tag-high-voltage-vertical-cable","tag-iec-60664-1-clearance-standards","tag-industrial-cable-installation-best-practices","tag-medium-voltage-mining-cable","tag-mining-cable-installation-guide","tag-mining-cable-manufacturer-china","tag-mining-cable-standards","tag-mining-cable-vde-compliance","tag-nec-300-19-vertical-conductor-support","tag-ntscgewou-cable-specifications","tag-polychloprene-rubber-cable","tag-power-cable-vertical-mounting","tag-rubber-insulated-mining-cable","tag-rubber-sheath-cable-properties","tag-sheath-creepage-prevention","tag-special-cable-anhui","tag-steel-wire-armored-cable-support","tag-submersible-cable-installation","tag-vde-vertical-cable-installation","tag-vertical-cable-engineering","tag-vertical-cable-inspection-procedures","tag-vertical-cable-strain-relief","tag-vertical-cable-support-spacing","tag-vertical-raceway-cable-installation","tag-vertical-shaft-cable-support","cs-entry"],"_links":{"self":[{"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/posts\/5077","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/comments?post=5077"}],"version-history":[{"count":1,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/posts\/5077\/revisions"}],"predecessor-version":[{"id":5079,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/posts\/5077\/revisions\/5079"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/media\/5078"}],"wp:attachment":[{"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/media?parent=5077"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/categories?post=5077"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/feichuncables.com\/blog\/wp-json\/wp\/v2\/tags?post=5077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}