PROTOMONT (V) NTSKCGECWOEU 3.6/6kV 是一款用于 coal cutter cables for chain operation 的中压采矿电缆。 它作为地下采矿移动设备和机器的动力连接电缆使用,典型设备包括 coal cutting machines。 资料明确说明,(V) coal cutter cables 专为 cable protection chains, 即 cable handler 应用设计,这类链系统拖曳在机器后方,并吸收运行过程中产生的拉伸力。

✓ Underground mining ✓ Coal cutting machines ✓ Cable protection chains ✓ 3.6/6kV ✓ PROTOLON EPR insulation ✓ PROTOFIRM PCP outer sheath
Rated Voltage
3.6/6
kV, Um 7.2kV
Test Voltage
11
kV main test voltage
Control Core Test
2
kV AC test voltage
Nominal Voltage
6000
V nominal voltage U
Torsional Stress
±25°
per metre
Bending Radius
2.3×D
at 5N/mm²
I
Product position

1. PROTOMONT (V) NTSKCGECWOEU 是什么?

PROTOMONT (V) NTSKCGECWOEU 是一款用于地下采矿移动设备的中压煤机电缆, 额定电压为 3.6/6 (7.2)kV。 它不是普通地面拖链电缆,也不是室内行车电缆,而是用于地下采矿场景中采煤机等移动机器的动力连接电缆。 其结构和性能围绕中压供电、链式保护、拉力吸收、监视导体、阻燃、耐油、耐臭氧和耐 UV 设计。

这款电缆的关键特征包括: class FS 镀锡极细绞合铜导体、双同心控制/PE 线绕包、EPR rubber PROTOLON 3GI3 绝缘、半导电易剥 NBR 外半导电层、GM1b EPR 内护套、钢/镀锡铜监视导体、PROTOFIRM PCP 5GM5 外护套、3.6/6kV 电压等级、11kV 测试电压、2kV 控制芯测试电压、90°C 导体温度、250°C 短路温度、-20°C 至 +60°C 柔性运行、±25°/m 扭转和 15N/mm² 拉伸规则

Core Engineering Position

核心判断:PROTOMONT (V) NTSKCGECWOEU 适合地下采矿中采煤机、移动采矿设备和 cable handler 链式保护系统。 它的价值不只是 6kV 中压供电,更在于能够配合 cable protection chain 吸收运行拉力, 并通过监视导体、控制/PE 导体结构、半导电层和高强度橡胶护套满足地下移动采矿场景的安全和机械要求。

1.1 与普通拖链电缆的差异

对比项目PROTOMONT (V) NTSKCGECWOEU工程含义
产品类别Coal cutter cable for chain operation面向地下采矿采煤机,不是一般工业拖链电缆。
应用设备Coal cutting machines, mobile mining equipment适合采矿移动设备动力连接。
链系统Cable protection chains / cable handler链系统拖在机器后方并吸收拉力。
电压等级3.6/6 (7.2)kV中压采矿供电场景。
测试电压11kV对应中压绝缘测试要求。
监视导体Steel / Cu-tinned wire spinning用于采矿电缆安全监视相关结构。
外护套PCP PROTOFIRM >5GM5适合矿用机械环境和动态链式运行。
S 型换向20×D min distanceS 型方向变化时必须保留足够距离。
II
Construction

2. 结构设计:class FS 镀锡铜、PROTOLON EPR、半导电 NBR、GM1b 内护套与 PROTOFIRM PCP 外护套

PROTOMONT (V) NTSKCGECWOEU 的结构明显服务于中压采矿移动供电。 导体为 very finely stranded copper conductor, tinned, class FS; PE 采用 double concentric control/PE wire spinning in outer interstices; 绝缘为 EPR rubber PROTOLON,special compound 3GI3; 外半导电层为 semi-conductive NBR easy-strip; 三根主芯绞合,外间隙内布置双同心控制/PE 导体元件; 内护套为 special EPR compound GM1b; 监视导体为 steel/Cu-tinned wires spinning; 外护套为 rubber-polychloroprene,即 PCP,PROTOFIRM special compound >5GM5。

Layer 1 — Class FS 镀锡极细绞合铜导体
Very finely stranded copper conductor, tinned (class FS)。 地下采矿移动设备频繁移动和受力,导体需要兼顾柔性、抗疲劳和导电可靠性。
Layer 2 — 双同心控制/PE 线绕包
PE: double concentric control/PE wire spinning in outer interstices。 该结构将控制/PE 元件布置在外部间隙中,有助于形成适合链式运行的圆整结构。
Layer 3 — EPR Rubber PROTOLON 3GI3 绝缘
Core insulation material 为 EPR rubber,PROTOLON,special compound 3GI3。 这是中压采矿移动电缆的关键绝缘系统,承担 3.6/6kV 工作电压和 11kV 测试电压要求。
Layer 4 — 半导电 NBR 易剥外层
Outer semi-conducting layer: yes;semi-conductive NBR easy-strip。 半导电层用于中压电缆电场控制,easy-strip 设计有利于现场端接和检修。
Layer 5 — 三根主芯与外间隙控制/PE 元件
Three main cores laid-up, with double concentric control/PE conductor elements in the outer interstice。 主芯为 natural color,控制芯为 blue。 结构识别清晰,有助于采矿设备接线和维护。
Layer 6 — GM1b 特殊 EPR 橡胶内护套
Material inner sheath 为 rubber,special EPR compound GM1b。 内护套用于稳定缆芯结构,减少链式运行中的内部相对位移。
Layer 7 — 钢/镀锡铜丝监视导体
Monitoring conductor 为 spinning of steel/Cu-tinned wires。 这是煤矿移动中压电缆的重要安全相关结构,应在端接、测试和维护中重点确认连续性。
Layer 8 — PROTOFIRM PCP 5GM5 外护套
Material outer sheath 为 rubber-polychloroprene,即 PCP; PROTOFIRM special compound >5GM5。 外护套承担矿用环境中的磨损、拖曳、油污、臭氧、UV 和机械冲击防护。
PROTOMONT Reliability = Class FS Tinned Copper + Double Concentric Control/PE Elements + PROTOLON EPR 3GI3 Insulation + Easy-strip Semi-conductive NBR + GM1b Inner Sheath + Steel/Cu-tinned Monitoring Conductor + PROTOFIRM PCP 5GM5 Outer Sheath
III
Electrical and thermal data

3. 电气与热参数:3.6/6kV、11kV 测试电压、控制芯 2kV

该电缆的额定电压为 3.6/6 (7.2)kV,nominal voltage U 为 6000V。 主绝缘测试电压为 11kV,控制芯 AC 测试电压为 2kV。 导体最高温度为 90°C,短路时导体最高温度为 250°C。 固定安装温度为 -40°C 至 +80°C,柔性安装温度为 -20°C 至 +60°C

电气 / 热项目参数工程解释
额定电压 U0/U (Um)3.6/6 (7.2)kV适用于 6kV 地下采矿移动设备供电。
Nominal voltage U6000V对应中压采煤机供电系统。
Test voltage11kV中压主绝缘耐压测试边界。
AC test voltage, control cores2kV控制芯测试要求。
导体最高温度90°C连续运行温度边界。
短路导体最高温度250°C短路热稳定校核边界,不是长期运行温度。
固定安装温度-40°C 至 +80°C适用于固定段或静态段。
柔性安装温度-20°C 至 +60°C适用于 cable handler 和移动链式运行段。
载流量依据DIN VDE 0298-4实际载流需结合矿用环境、散热和链内布置校核。

Medium Voltage Application Reminder

3.6/6kV 采煤机电缆属于中压移动电缆。 现场不能按普通低压拖链线处理。 半导电层剥离、主芯端接、监视导体连接、控制芯测试、接头防护和电缆 handler 链内固定方式,都需要按中压矿用电缆标准流程执行。

IV
Mechanical and chain operation

4. 机械性能:cable handler 吸收拉力,±25°/m 扭转,2.3×D 弯曲半径

PROTOMONT (V) NTSKCGECWOEU 的机械应用边界非常关键。 资料说明 cable protection chains,即 cable handler,拖在机器后方并吸收运行中产生的拉伸力。 电缆本体的 torsional stress 为 ±25°/m, permanent tensile strength rule 为 15N/mm²。 弯曲半径规则为 2.3×D at 5N/mm²; 对于 S-type directional changes,最小距离为 20×D

机械项目参数深度使用者解读
链式运行Cable protection chains / cable handler链系统拖在机器后方并吸收拉力,是本系列应用核心。
永久拉伸强度规则15N/mm²用于判断端部固定、链内牵引和运行拉力边界。
扭转应力±25°/m允许一定扭转,但不能作为强扭转电缆无限制使用。
弯曲半径2.3×D at 5N/mm²必须结合实际链内拉力理解,不能脱离 5N/mm² 条件。
S 型方向变化20×D minimum distanceS 型换向需要足够距离,否则局部应力会显著增加。
柔性运行温度-20°C 至 +60°C链式动态段应在此温度范围内运行。

4.1 2.3×D 不是任意条件下的最小弯曲半径

资料给出的弯曲半径是 2.3×D at 5N/mm²。 这意味着弯曲半径与拉力条件绑定。 如果现场拉力更高、链槽导向不顺、煤尘堆积、链节卡滞或 S 型换向距离不足,实际寿命会明显下降。 因此,在采煤机 cable handler 系统中,应同时校核弯曲半径、拉力、扭转、S 型换向距离和护套磨损。

困扰 1:只看 2.3×D,不看 5N/mm² 条件

弯曲半径参数与拉力条件绑定,超出拉力条件时不能简单套用。

困扰 2:S 型换向距离不足

S-type directional changes 要求 20×D 最小距离,距离不足会加速局部疲劳。

困扰 3:cable handler 卡滞

链系统如果卡滞,原本应由链吸收的拉力可能转移到电缆本体和端部。

困扰 4:监视导体连续性被忽略

钢/镀锡铜监视导体是矿用电缆安全相关结构,维护时不能只测主芯。

V
Environment and safety properties

5. 环境与安全性能:阻燃、耐油、耐臭氧、耐 UV

PROTOMONT (V) NTSKCGECWOEU 的环境性能参数包括: flame retardant in accordance with EN/IEC 60332-1-2, oil resistant: Yes, ozone resistance: Yes, resistant to UV: Yes。 结合 PROTOFIRM PCP 5GM5 外护套,它适合地下采矿设备中存在机械磨损、油污、臭氧和复杂移动环境的应用。

环境 / 安全项目参数现场意义
阻燃EN/IEC 60332-1-2降低单根电缆火焰传播风险。
耐油Yes适合采矿机械润滑油和工业油污环境。
耐臭氧Yes适合电气设备和橡胶老化环境。
耐 UVYes资料列出 UV resistance,但该系列核心应用仍为地下采矿。
外护套PCP PROTOFIRM >5GM5承担矿用机械磨损、拖曳和外部保护。
柔性低温-20°C动态链式运行最低温度边界。
柔性高温+60°C动态链式运行最高温度边界。
VI
Standards and approvals

6. 标准与认证:DIN VDE、MSHA、WUG Poland 和 GOST 证书

资料列出的标准和认证包括 DIN VDE 0250-813、DIN EN 60228 / IEC 60228 / VDE 0295、DIN VDE 0298-4、 DIN EN 60332-1-2 / IEC 60332-1-2、DIN EN 60811-404 / IEC 60811-404、 GOST -R/-K/-B Fire Certificate of Russian Federation、MSHA P-07-KA140034,以及 WUG Poland (6kV only)。 这些内容说明该电缆不仅是结构型矿用电缆,也面向特定矿用市场和安全认证环境。

标准 / 认证资料描述工程意义
DIN VDE 0250-813Listed矿用移动电缆相关设计标准体系。
DIN EN 60228 / IEC 60228 / VDE 0295Listed导体结构和导体等级依据。
DIN VDE 0298-4Listed载流量选型依据。
DIN EN 60332-1-2 / IEC 60332-1-2Listed单根电缆阻燃测试体系。
DIN EN 60811-404 / IEC 60811-404Listed材料耐油等测试相关标准。
GOST -R/-K/-B Fire CertificateRussian Federation面向相关市场的防火证书要求。
MSHAP-07-KA140034矿用应用相关批准信息。
WUG Poland6kV only适用于 6kV 版本的波兰矿用相关批准。
VII
Specification data

7. 规格数据:18 个型号覆盖 STKON 与 2×ST 控制结构

该系列规格覆盖 3×25 至 3×240 主芯截面,并配置控制/PE 导体与 UELKON 结构。 表格中有两类主要结构: 第一类为 3x… + 3x(1.5STKON + …/3KON) + UELKON; 第二类为 3x… + 3x(2×1.5ST + …/3KON) + UELKON。 对现场选型来说,除了主芯截面,还必须关注外径、重量、控制结构、链系统空间和 cable handler 拉力边界。

7.1 STKON 控制结构规格

Product NumberBasic ConstructionExternal CodeConductor Diameter mmCable Diameter Min mmCable Diameter Max mmCable Weight kg/km
V_N_6KV_0013×25+3x(1.5STKON + 16/3KON)+UELKON7.145.048.03600
200050703×35+3x(1.5STKON + 25/3KON)+UELKON5DM15488.447.351.34360
200483313×50+3x(1.5STKON + 25/3KON)+UELKON5DM154910.151.455.45320
200050683×70+3x(1.5STKON + 35/3KON)+UELKON5DM154111.956.760.76560
200050693×95+3x(1.5STKON + 50/3KON)+UELKON5DM154214.061.265.27890
200088603×120+3x(1.5STKON + 70/3KON)+UELKON5DM158115.567.371.39780
200426113×150+3x(1.5STKON + 70/3KON)+UELKON5DM158817.271.775.711300
200050793×185+3x(1.5STKON + 95/3KON)+UELKON5DM158519.175.179.112790
204814833×240+3x(1.5STKON + 120/3KON)+UELKON5DM1***22.082.686.616000

7.2 2×1.5ST 控制结构规格

Product NumberBasic ConstructionExternal CodeConductor Diameter mmCable Diameter Min mmCable Diameter Max mmCable Weight kg/km
202734113×35+3x(2×1.5ST + 25/3KON)+UELKON5DM15898.449.053.04620
V_N_6KV_0033×50+3x(2×1.5ST + 25/3KON)+UELKON5DM159010.153.957.95550
202662053×70+3x(2×1.5ST + 35/3KON)+UELKON5DM156911.956.760.76760
202267513×95+3x(2×1.5ST + 50/3KON)+UELKON5DM162114.062.066.07900
V_N_6KV_0043×120+3x(2×1.5ST + 70/3KON)+UELKON15.567.371.39800
V_N_6KV_0053×150+3x(2×1.5ST + 70/3KON)+UELKON17.271.075.011100
V_N_6KV_0063×185+3x(2×1.5ST + 95/3KON)+UELKON19.175.179.113000
V_N_6KV_0073×240+3x(2×1.5ST + 120/3KON)+UELKON22.082.787.716000

Specification Note

3×240 规格重量达到 16000kg/km,外径最大可达 87.7mm。 这类大型中压采煤机电缆不仅是电气选型问题,更是 cable handler 承载、弯曲半径、端部固定、现场搬运和更换维护问题。 External code 中出现 5DM1*** 或空白时,报价和下单前应核对完整料号。

VIII
Selection logic

8. 如何选型:先确认地下采矿链式运行,再核对中压、监视、拉力和 S 型换向

PROTOMONT (V) NTSKCGECWOEU 的选型不能只看主芯截面。 正确逻辑应从应用场景开始:是否为地下采矿移动设备,是否用于采煤机,是否通过 cable protection chain/cable handler 运行, 链系统是否能吸收拉力,是否存在 S 型方向变化,是否需要特定认证和批准。 在此基础上再确认电压等级、控制结构、PE/KON 结构、外径、重量、弯曲半径和端接方式。

选型步骤需要确认为什么重要
1. 确认应用Underground mining mobile equipment该电缆面向地下采矿,不是普通工业电缆。
2. 确认设备Coal cutting machines 等匹配采煤机动力供电和移动运行。
3. 确认链系统Cable protection chains / cable handler链系统需要吸收运行拉力。
4. 确认电压3.6/6 (7.2)kV匹配 6kV 中压系统。
5. 确认测试要求11kV main, 2kV control cores满足主芯和控制芯测试边界。
6. 核对控制结构1.5STKON 或 2×1.5ST影响控制、监视、接线和维护。
7. 核算外径45mm 至 87.7mm决定 cable handler 链槽、弯曲半径和安装空间。
8. 核算重量3600kg/km 至 16000kg/km决定链系统负载、牵引力和现场搬运。
9. 检查弯曲条件2.3×D at 5N/mm²弯曲半径必须结合拉力条件使用。
10. 检查 S 型换向20×D min distanceS 型换向距离不足会造成局部疲劳。
11. 检查认证MSHA, WUG Poland, GOST 等矿用项目常有严格批准要求。
12. 检查端接半导电层、监视导体、控制芯中压矿用电缆端接质量决定安全性。
Good PROTOMONT Selection = Underground Mining Application + Cable Handler Chain + 3.6/6kV System + Correct Control/PE Structure + Monitoring Conductor Continuity + 2.3×D at 5N/mm² + 20×D S-type Distance + Certified Mining Approval
IX
User experience

9. 作为深度使用者的看法:这类电缆的关键不是“能弯”,而是“在拉力、链条和中压安全下可靠运行”

PROTOMONT (V) NTSKCGECWOEU 的强项很明确: 它是地下采矿采煤机专用中压链式运行电缆, 具备 PROTOLON EPR 绝缘、半导电易剥层、监视导体、GM1b 内护套、PROTOFIRM PCP 外护套和多项矿用认证/批准。 这不是普通拖链电缆可以替代的场景。

但现场寿命往往取决于 cable handler 系统。 如果链条不能顺畅吸收拉力,电缆端部固定错误,S 型换向距离不足,煤尘和异物造成卡滞,监视导体没有正确检测, 或中压端接处理不规范,电缆本体性能再高也可能提前失效。 对 6kV 采煤机电缆来说,机械、绝缘和安全监视必须作为一个系统看待。

使用者看法 1:cable handler 是寿命核心

链系统必须真正吸收拉力,而不是让拉力集中到电缆端部或局部护套。

使用者看法 2:监视导体不能被当作普通附属线

钢/镀锡铜监视导体应纳入安装测试和维护检查流程。

使用者看法 3:大截面规格要先看重量

3×240 规格达到 16000kg/km,搬运、链条承载和端部固定都必须提前规划。

使用者看法 4:中压端接比低压更敏感

半导电层剥离、应力控制、控制芯和监视导体连接必须严格执行工艺。

Daily Operation Pain Points

  • 把 3.6/6kV 采煤机电缆当作普通低压拖链线处理。
  • cable handler 链条卡滞,导致拉力没有被链系统有效吸收。
  • 只按 2.3×D 布置,却忽略该参数对应 5N/mm² 拉力条件。
  • S 型方向变化距离不足,没有满足 20×D 最小距离。
  • 监视导体连续性和端接质量没有纳入检修记录。
  • 半导电 NBR easy-strip 层处理不规范,影响中压端接质量。
  • 3×185、3×240 等重型规格更换时未评估吊装、拖拽和端部固定。
  • 柔性运行温度超过 -20°C 至 +60°C 边界。
  • 带有空白或不完整 external code 的规格未在下单前核对完整料号。

希望的改进方向

第一,希望资料为 2.3×D at 5N/mm² 提供更直观的弯曲半径速查表; 第二,希望按不同外径给出 S 型方向变化 20×D 最小距离表; 第三,希望提供 cable handler 链条布置和拉力吸收示意; 第四,希望提供监视导体端接和测试流程说明; 第五,希望对 3×185、3×240 等重型规格提供搬运、更换和端部固定建议。

X
Application guide

10. 适用与不适用场景

场景是否适合原因
地下采矿移动设备非常适合产品描述明确用于 underground mining applications。
Coal cutting machines非常适合资料明确列出 coal cutting machines。
Cable protection chains非常适合(V) coal cutter cables 设计用于 cable protection chains。
Cable handler 拖曳系统非常适合链系统拖在机器后方并吸收拉力。
6kV 中压矿用供电适合额定电压 3.6/6 (7.2)kV,nominal voltage 6000V。
需要监视导体的矿用系统适合结构中包含 steel/Cu-tinned wire monitoring conductor。
普通室内低压设备通常过度配置该电缆面向中压地下采矿应用。
无 cable handler 的强拉力拖曳不建议产品说明强调链系统吸收拉力。
S 型换向距离不足场景不建议资料要求 S-type directional changes 至少 20×D。
超过柔性温度范围的动态运行不建议柔性安装温度为 -20°C 至 +60°C。

Final Engineering Judgement

PROTOMONT (V) NTSKCGECWOEU 3.6/6kV 是一款用于地下采矿移动设备和采煤机的中压煤机链式运行电缆。 它专为 cable protection chains / cable handler 设计,由链系统拖在机器后方并吸收运行拉力。 其关键价值包括:class FS 镀锡极细绞合铜导体、双同心控制/PE 线绕包、PROTOLON EPR 3GI3 绝缘、半导电 NBR easy-strip 外层、GM1b EPR 内护套、steel/Cu-tinned wire 监视导体、PROTOFIRM PCP 5GM5 外护套、3.6/6 (7.2)kV 电压等级、11kV 主测试电压、2kV 控制芯测试、90°C 导体温度、250°C 短路温度、阻燃、耐油、耐臭氧、耐 UV、±25°/m 扭转、15N/mm² 拉伸规则、2.3×D at 5N/mm² 弯曲半径,以及 S 型换向 20×D 最小距离。 它的长期可靠性取决于电缆本体、cable handler 链系统、中压端接、监视导体检测、S 型换向距离、拉力控制和矿用现场维护的整体匹配。

XI
FAQ

11. FAQ:工程师常见问题

问题 1:PROTOMONT (V) NTSKCGECWOEU 是什么电缆?

回答:它是 3.6/6kV 煤矿采煤机链式运行电缆,用作地下采矿移动设备和采煤机的动力连接电缆。

问题 2:它为什么强调 cable protection chains?

回答:因为 (V) coal cutter cables 设计用于 cable protection chains,也就是 cable handler。 该链系统拖在机器后方,并吸收运行过程中产生的拉伸力。

问题 3:它的额定电压和测试电压是多少?

回答:额定电压为 3.6/6 (7.2)kV,nominal voltage U 为 6000V; 主测试电压为 11kV,控制芯 AC 测试电压为 2kV。

问题 4:它的绝缘和护套材料是什么?

回答:芯线绝缘为 EPR rubber PROTOLON,special compound 3GI3; 内护套为 GM1b 特殊 EPR 橡胶; 外护套为 PCP rubber PROTOFIRM,special compound >5GM5。

问题 5:它是否有半导电层?

回答:有。资料列出 outer semi-conducting layer: yes,材料为 semi-conductive NBR easy-strip。

问题 6:监视导体是什么结构?

回答:Monitoring conductor 为 spinning of steel/Cu-tinned wires。 现场维护时应重点确认其连续性和端接质量。

问题 7:弯曲半径是多少?

回答:弯曲半径规则为 2.3×D at 5N/mm²。 对 S-type directional changes,要求 20×D minimum distance。

问题 8:现场最容易忽略什么?

回答:最容易忽略 cable handler 链条吸收拉力、2.3×D 对应的 5N/mm² 条件、S 型换向 20×D 距离、半导电层端接、监视导体连续性、重型规格重量和柔性运行温度边界。

Anhui Feichun Special Cable Co., Ltd. — 地下采矿中压移动电缆、采煤机电缆与 cable handler 链式运行方案

Anhui Feichun Special Cable Co., Ltd. 可面向 underground mining applications、coal cutting machines、mobile mining equipment、cable protection chains、cable handler systems、3.6/6kV 中压供电、监视导体矿用电缆、PCP 护套采矿电缆和重型链式运行电缆,提供规格选型、外径重量核算、弯曲半径校核、S 型换向距离检查、端部固定建议、监视导体测试建议和现场维护支持。

Feichun Engineering Contact
Telephone: +86 13855123218
Email: [email protected]

Feichun supports customers requiring PROTOMONT type cable selection, 3.6/6kV coal cutter cable engineering, underground mining cable application review, cable handler chain operation assessment, monitoring conductor continuity checking, semi-conductive layer termination support, PCP PROTOFIRM outer sheath evaluation, heavy mining cable weight review, S-type directional change distance checking, and practical maintenance guidance for medium-voltage mobile mining power systems.

Document Reference: FEICHUN-PROTOMONT-V-NTSKCGECWOEU-3-6-6KV-COAL-CUTTER-CABLE-CN-V1 · PROTOMONT · (V) NTSKCGECWOEU · 3.6/6kV · Coal Cutter Cables for Chain Operation · Underground Mining Applications · Coal Cutting Machines · Cable Protection Chains · Cable Handler · Class FS Tinned Copper · Double Concentric Control/PE Wire Spinning · PROTOLON EPR 3GI3 · Semi-conductive NBR Easy-strip · GM1b Inner Sheath · Steel/Cu-tinned Monitoring Conductor · PROTOFIRM PCP 5GM5 Outer Sheath · 11kV Test Voltage · 2kV Control Core Test · Flame Retardant · Oil Resistant · Ozone Resistant · UV Resistant · ±25°/m Torsional Stress · 15N/mm² Tensile Rule · 2.3×D at 5N/mm² · 20×D S-type Directional Changes · MSHA P-07-KA140034 · WUG Poland 6kV Only · Feichun Engineering
Previous Article

RONDOFLEX CHAIN (N)GRDG(CG)OEU 0.6/1kV:面向高速、长行程与户外拖链系统的屏蔽型低压电缆深度解析

Next Article

PROTOMONT (VO) (N)TSKCGEWOEU 1.8/3kV:用于地下采矿采煤机链式运行的 3kV 煤机电缆深度解析

Write a Comment

Leave a Comment

您的邮箱地址不会被公开。 必填项已用 * 标注